Summary
The City of Branson, Missouri solicits proposals to install a gas-fired tube radiant heating system in Branson Fire Station 2, including extending natural gas service to the kitchen stove and exterior patio BBQ, installing an emergency gas shutoff for the kitchen stove, ceiling-mounted air circulation fans, and decommissioning existing electric heating equipment. The scope includes furnishing all labor, materials, equipment, permits, testing, commissioning, and compliance with applicable building, mechanical, fuel gas, electrical, and fire safety codes; period of performance is expected to complete by July 1, 2026. Proposals are due July 1, 2026 at 1:30 PM local time and must be submitted electronically through DemandStar; bid opening is teleconference.