Summary
Scope of work to be performed consists of, but not limited to, the renovation/ remodel of the fire fighter restroom facilities. The restroom renovation layout has been developed to satisfy the operational needs (privacy, gender neutral, accessibility) of the district. The interior renovations are taking place at the location of the existing restroom/shared facilities. They will provide the fire station with individual/singleuse private facilities. In addition, at fire station no. 174, the flooring in the kitchen and connected hallway will be replaced with a durable epoxy terrazzo finish for improved longevity and ease of maintenance. In addition, at fire station no. 175, there will be roof mechanical systems and roof repairs work.