Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of Spotsylvania is soliciting proposals for professional architectural and engineering services to evaluate, design, and implement upgrades and rehabilitation for the Ni River Water Treatment Plant. The solicitation was posted on January 23, 2026, and has a response deadline of March 2, 2026. The procurement identifies Senior Procurement Officer Sylvia Dyson as the primary contact for this multi-million dollar infrastructure project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Concrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Concrete rehabilitation of Treatment Building 1 at City of Greeley Bellvue Water Treatment plant.
AvailableThe City of Grants Pass requests proposals for hauling Water Treatment Plant solids for fiscal years 2024–2026, moving solids between the WTP, the old log pond site, the Redwood pump station, and Dry Creek Landfill. Full solicitation documentation and attachments are available on the City of Grants Pass bids page (link provided on the aggregator), and site-visit/contact information is managed by the buyer.
Posted Date
Mar 1, 2023
Due Date
Dec 31, 2026
Release: Mar 1, 2023
Close: Dec 31, 2026
The City of Grants Pass requests proposals for hauling Water Treatment Plant solids for fiscal years 2024–2026, moving solids between the WTP, the old log pond site, the Redwood pump station, and Dry Creek Landfill. Full solicitation documentation and attachments are available on the City of Grants Pass bids page (link provided on the aggregator), and site-visit/contact information is managed by the buyer.
AvailableThe City of Grants Pass requests proposals for hauling Water Treatment Plant solids for fiscal years 2024–2026, moving solids between the WTP, the old log pond site, the Redwood pump station, and Dry Creek Landfill. Full solicitation documentation and attachments are available on the City of Grants Pass bids page (link provided on the aggregator), and site-visit/contact information is managed by the buyer.
Posted Date
Mar 1, 2023
Due Date
Dec 31, 2026
Release: Mar 1, 2023
Close: Dec 31, 2026
The City of Grants Pass requests proposals for hauling Water Treatment Plant solids for fiscal years 2024–2026, moving solids between the WTP, the old log pond site, the Redwood pump station, and Dry Creek Landfill. Full solicitation documentation and attachments are available on the City of Grants Pass bids page (link provided on the aggregator), and site-visit/contact information is managed by the buyer.
The project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
Posted Date
Jan 9, 2026
Due Date
Feb 17, 2026
Release: Jan 9, 2026
Close: Feb 17, 2026
The project consists of rehabilitating the existing Regional Water Treatment Plant by replacing the existing electrical actuators for the filters and softener process valves, removal of the existing filter and softener media and replacement with new media, rehabilitation of the existing filter and softener vessels, addition of a new waste holding basin, and rehabilitation of the existing waste holding basin circular sludge collection system equipment for Waste Holding Basin #2.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →