CityNC
Posted
Aug 10, 2026
Oct 7, 2026
Design-Build for Transit Facility Upfit Projects RFP
Design_build: provide design-build services for transit facility upfit projects.
Description: The Metropolitan Washington Airports Authority is soliciting a qualified design-build contractor for improvements to the Live Fire Training Facility at Washington Dulles International Airport; this is a construction RFP, not a grant program. The scope includes permit-ready design and modernization of the existing facility, new burn facilities and a modular burn building, an SCBA Training Center, an administrative/classroom building, a storage garage, a wide-body aircraft simulator, and related site and utility improvements. The official page marks the opportunity NEW and prints submission deadlines of October 16, 2026 and November 3, 2026; the later date is treated as the current deadline, and no primary PDF, DOC, or PPT file is linked.
SpecialDistrict · DC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityNC
Posted
Aug 10, 2026
Oct 7, 2026
Design_build: provide design-build services for transit facility upfit projects.
CityNC
Posted
Aug 10, 2026
Oct 7, 2026
Design_build: provide design-build services for transit facility upfit projects.
CityCA
Posted
Sep 10, 2026
Oct 8, 2026
The City of Santa Clara is soliciting proposals from qualified consultants for professional design and engineering services to improve security at its fire stations. The work includes assessing existing site conditions and preparing bid-ready plans, specifications, and engineer’s cost estimates, with Fire Stations 8, 3, 4, and 1 addressed in that priority order. The re-advertised RFP was published September 10, 2026, and responses are due October 8, 2026, at 3:00 PM PDT; the project is funded through Measure I, a voter-approved general obligation bond measure.
CityIN
Posted
Sep 18, 2026
Oct 19, 2026
DESIGN-BUILD Work includes demolition, and construction of a new, permanent, ADA-compliant, four-season public restroom facility, replacing the existing restroom structure on that site. The building shall consist of 550 to 900 SF of conditioned space, including a men's restroom, a women's restroom, and a storage room, together with exterior lighting, utility connections, concrete walkways connecting to the existing park path system, and site restoration and landscaping.
Decision makers connected to this RFP from Metropolitan Washington Airports Authority.