CityAK
Posted
Aug 28, 2026
Oct 1, 2026
26-28 Bailey Mooring Dolphin Design and Engineering Services RFP
Engineering services are sought for the replacement of a timber pile mooring dolphin used by tug and fuel barge operations to deliver diesel to a powerhouse tank farm, including design, permitting, and construction bidding assistance.