Raleigh Durham Airport Authority
Special DistrictNC
Posted
Sep 17, 2026
Nov 4, 2026
Park Economy 3 Expansion - EV Charging Lot RFP
Installation of Solar PV system on existing covered walkway canopy, installation of BESS system, installation of 100 Level 1 EV chargers. Work includes installation of all necessary electrical infrastructure to support these installations as well as coordination with Duke Power for interconnection.
