Southfield Public School District
School DistrictMI
Jul 4, 2026
Closes
Aug 5, 2026
Levey Middle School - Large Format AV Upgrades (RFP)
Large Format AV Upgrades.
Description: Southfield Public Schools is soliciting bids for large-format audiovisual upgrades at various district locations. The Invitation for Bid requires attendance at a pre-bid conference and walk-through, specified disclosure and sanctions affidavits, and a bid security instrument of at least five percent of the base bid. The solicitation opened on July 20, 2026, and bids are due August 5, 2026; it is an active procurement as of July 22, 2026 and is not a grant program.
SchoolDistrict · MI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Southfield Public School District.
Adjacent opportunities open for bidding right now.
Southfield Public School District
School DistrictMI
Jul 4, 2026
Closes
Aug 5, 2026
Large Format AV Upgrades.
CityWI
Jul 23, 2026
Closes
Aug 11, 2026
In general, the project will involve installation of air-cooled condensing units and associated cooling coils for the air conditioning system at the City of Onalaska City Hall and Omni Center.
CityAZ
May 11, 2026
Closes
Jul 29, 2026
Provide large format commercial printing services.
CityUT
Jul 9, 2026
Closes
Aug 13, 2026
The WRF 2026 Upgrades (Hereafter referred to as “Project”) consists of construction of improvements to the existing solar drying processes at the WRF, including retrofit of the solar dryer greenhouse, demolition, new heated floors, site work, yard piping, electrical and instrumentation, HVAC and plumbing, and all other equipment and infrastructure to make the upgraded facilities complete and operational; construction of a new boiler room at the existing WRF, including installation of a new pre-engineered metal building to also include electrical, HVAC and plumbing, and all other equipment and infrastructure to make the boiler room facility complete and operational; new ultraviolet (UV) disinfection system to be retrofit into the existing Channel #2, including electrical and instrumentation, demolition, and all other equipment and infrastructure required to make the upgraded facilities complete and operational. The integration of SCADA will be by Owner under a separate contract. The HUBER solar dryer turners and Trojan UV disinfection system equipment have been pre-procured by the Owner and will be assigned to the General Contractor for installation and startup.