Open RFP

Repair of Cedar Creek Flood Prevention Dam No. 9 (Request for Proposal)

Description: Clear, grub and revegetate areas along the upstream slope and between the downstream toe of the embankment to a point that is 20 feet downstream and reinstall fencing. Clear and grub around the plunge pool and reconstruct the plunge pool with earthfill and riprap armoring. Installation of shoreline wave protection in the form of riprap. Lime stabilization and regrading of the near surface soils along the upstream and downstream slopes to repair historic surface slides and stabilize the slopes. Repair minor erosion in lower part of auxiliary spillway. Replacing the low-level sluice gate and trash rack on the principal spillway riser structure regrading the auxiliary spillway control section.

Buyer
Rockwall County

County · TX, US

Released
Oct 30, 2026
Closes
Dec 14, 2026(39 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts