Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN BUILD contract is end-of-lifecycle replacement of four (4) banks of 525-kV series capacitors installed at four (4) substation. he Contractor will engineer, procure, and construct (EPC) by removing and replacing the existing series capacitor banks with new and in-kind series capacitor banks (no changes to series capacitor size, rating, segmentation, and line compensation level).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The SC Technical College System issued a Request for Information to gather market information and identify contractors able to design, build, and deliver custom training aids. The solicitation requests respondents demonstrate relevant experience and qualifications to provide high-quality custom training aids.
Posted Date
Dec 5, 2024
Due Date
Dec 13, 2025
Release: Dec 5, 2024
Close: Dec 13, 2025
The SC Technical College System issued a Request for Information to gather market information and identify contractors able to design, build, and deliver custom training aids. The solicitation requests respondents demonstrate relevant experience and qualifications to provide high-quality custom training aids.
AvailableProvision of vendor to conduct a feasibility study and design for substation B in the Atrium.
Posted Date
Oct 6, 2025
Due Date
Dec 30, 2025
Release: Oct 6, 2025
Close: Dec 30, 2025
Provision of vendor to conduct a feasibility study and design for substation B in the Atrium.
AvailableSeeking prospective Build-Ready sites that: 1. Fall within one of the following land use types: Are 65 acres or larger. Sites smaller than 65 AC will not be considered through this RFI. Dormant electric generating sites. Former industrial sites. Existing or abandoned commercial sites. Brownfields. Landfills. Other underutilized sites. 2. Have flat or gently sloped terrain.
Posted Date
Jul 23, 2020
Due Date
Dec 30, 2027
Release: Jul 23, 2020
Close: Dec 30, 2027
Seeking prospective Build-Ready sites that: 1. Fall within one of the following land use types: Are 65 acres or larger. Sites smaller than 65 AC will not be considered through this RFI. Dormant electric generating sites. Former industrial sites. Existing or abandoned commercial sites. Brownfields. Landfills. Other underutilized sites. 2. Have flat or gently sloped terrain.
AvailableSoliciting proposals for Design Bid Build Professional Design Services for the renovation of the 46,610 sq. ft. County Administration Building.
Posted Date
Nov 24, 2025
Due Date
Dec 22, 2025
Release: Nov 24, 2025
Close: Dec 22, 2025
Soliciting proposals for Design Bid Build Professional Design Services for the renovation of the 46,610 sq. ft. County Administration Building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis