Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Metropolitan Transportation Authority seeks a qualified Design-Builder to provide design-build services for ADA upgrades, including the installation of new elevators at five (5) NYCT Stations, and a separate contract for the long-term maintenance of new elevators.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
Posted Date
Dec 30, 2025
Due Date
Feb 25, 2026
Release: Dec 30, 2025
Close: Feb 25, 2026
DESIGN-BUILD Provide design-build services to for ADA upgrades at three nyct stations including state of good repair.
AvailableThe City of Durham is soliciting Statements of Qualifications (SOQs) from design-build teams for PFAS treatment, electrical upgrades, and liquid ammonia storage improvements at Brown and Williams Water Treatment Plants.
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
The City of Durham is soliciting Statements of Qualifications (SOQs) from design-build teams for PFAS treatment, electrical upgrades, and liquid ammonia storage improvements at Brown and Williams Water Treatment Plants.
AvailableDunn County is seeking qualified design-build firms to replace and modernize the HVAC system at the Dunn County Judicial Center through a comprehensive design-build procurement. The project specifically requires a single design-build entity responsible for complete turnkey services. This includes design, engineering, procurement, construction, commissioning, and warranty.
Posted Date
Dec 8, 2025
Due Date
Jan 28, 2026
Release: Dec 8, 2025
Close: Jan 28, 2026
Dunn County is seeking qualified design-build firms to replace and modernize the HVAC system at the Dunn County Judicial Center through a comprehensive design-build procurement. The project specifically requires a single design-build entity responsible for complete turnkey services. This includes design, engineering, procurement, construction, commissioning, and warranty.
AvailableDesign-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis