Bulkheads for Rancho Penasquitos Hydroelectric Facility
Procurement and delivery of six bulkheads to isolate three 42" inside diameter flow control pipe trains for isolation valve work.
Description: Project includes temporary construction fencing, signage and staging, demolition, earthwork, excavation/grading, installation of 6" area drains, 4" PVC perforated pipe, rip rap, gravity retaining walls, pedestrian guardrail, 4" concrete paving, 6" concrete pad at ADA parking, irrigation system installation. See attached file.
County · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Aug 27, 2026
Sep 14, 2026
Procurement and delivery of six bulkheads to isolate three 42" inside diameter flow control pipe trains for isolation valve work.
Posted
Sep 9, 2026
Sep 24, 2026
Contract A consists of the installation of public watermain, sanitary sewer, storm sewer, grading, roadway restoration, and other miscellaneous items of work. Contract B consists of a lump sum bid for a water metering station and antenna.
California Santa Monica Mountains Conservancy
State AgencyCA
Posted
Mar 26, 2026
Jun 30, 2028
The funds appropriated in this item shall be available for the randall preserve for work that supports the reduction of climate impacts on disadvantaged communities and vulnerable populations and the creation, protection, and expansion of outdoor recreation opportunities pursuant to section 94020 of the public resources code and shall be available for encumbrance or expenditure until June 30, 2028.
Virginia Department for the Blind and Vision Impaired
State AgencyVA
Posted
Sep 10, 2026
Oct 14, 2026
The Department for the Blind and Vision Impaired is inviting sealed bids for the construction of an outdoor classroom pavilion at its Richmond campus. The approximately 1,960-square-foot project includes grading, landscaping, site masonry, concrete foundations and sidewalks, outdoor lighting and electrical work, and drainage utilities. The campus will remain occupied during construction, requiring coordination with the facility.
Decision makers connected to this RFP from County of San Diego.