Conduct Phase 2 of the Burlington Prairie Parking Lot RFP
Aug 13, 2026
Closes
Sep 4, 2026
Conduct phase 2 of the parking lot, which will be expanded and upgraded to asphalt and permeable paving solutions. The retired roadway within leroy oakes forest preserve will be fully deconstructed, removed and filled in with clean topsoil.
