CityOH
Posted
Oct 20, 2026
Nov 13, 2026
Wastewater Treatment Plant Sludge Dewatering Project RFP
Provide wastewater treatment plant sludge dewatering work.
Description: Furnishing all labor, materials, and equipment necessary to replace in-kind the existing Return Activated Sludge (RAS) pumps. Other related work includes in-kind valve and pipe replacement, as well as preparing, restoring, and cleaning the project area.
City · NY, US
Adjacent opportunities open for bidding right now.
CityOH
Posted
Oct 20, 2026
Nov 13, 2026
Provide wastewater treatment plant sludge dewatering work.
Central Contra Costa Sanitary District
Special DistrictCA
Posted
Oct 20, 2026
Nov 12, 2026
The work generally consists of installation of owner-furnished hydrocyclone and compressed air channel mixing systems, return activated sludge piping modifications, and installation, rental, and decommissioning of temporary bypass pumping, piping, and power infrastructure. The estimated cost of construction is $6,250,000. Central San, at its discretion, may add additional construction activities after the award of the Construction Contract. Only pre-qualified general contractors listed under the bid documents are allowed to submit bids.
Southern University and A M College
Higher EducationLA
Posted
Oct 28, 2026
Nov 30, 2026
Provide boiler & pump replacement.
Mckean County Housing Authority
Special DistrictPA
Posted
Oct 15, 2026
Nov 6, 2026
Replacement of seven boilers at multiple McKean County Housing Authority properties, including associated components, piping, electrical work, testing, and disposal.
Decision makers connected to this RFP from Village of Cold Spring.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
246 days before RFP
Staff proposed a borrowing framework of up to approximately $400,000–$500,000 for staged wastewater-plant equipment projects, including two pumps in the first year.
Water and waste water. Um the request here um is a little different. Um and we Laura and I talked with Mayor Cle about it and it's and we talked to Will I talked to Will about it too with mayor earlier. Um the sewer fund has an old bond payment that is now paid off. It was paid off in October. That was a 35,000 principal. Interest was hardly anything…
Board Of Trustees Workshop Meeting
Board meeting · Feb 25, 2026
Board meeting
239 days before RFP
The Village Board of Trustees adopted authorization to issue up to $250,000 in bonds for improvements to the wastewater treatment plant.
I will make a motion regarding resolution 8 authorizing the issuance of bonds and a principal amount not to exceed $250,000 to finance the construction of improvements to the weightwater treatment plant. I am offering the resolution um and moving its adoption. It is a bond resolution the village of Cold Spring, New York adopted March 4th, 2026 authorizing…
Board Of Trustees Workshop Meeting
Board meeting · Mar 4, 2026
Board meeting
141 days before RFP
The Water and Wastewater Department began working with Hahn Engineering to replace two RAS pumps and their existing controls.
Wastewater: Total Inflow to Plant: 6.89MG / 222k/day Sludge Hauled Offsite: 31,000 Gallons Biochemical Oxygen Demand: 95.86% Total Suspended Solids: 94.78% • Sludge Hauling: Earthcare onsite May 6th, 13th, 20th, and 27th. • Headworks Auger: Brush Kit to be installed at earliest opportunity. • SPDES Permit Renewal: Application under review. • Perimeter…
Village of Cold Spring Board of Trustees Monthly Meeting
Board meeting · Jun 10, 2026
Board meeting
22 days before RFP
At its October 7 workshop, the Board discussed a three-year wastewater priority list and reported that a $400,000 bond had been authorized, with $250,000 drawn down, while RAS pump costs remained unresolved.
Um wastewater treatment plant I didn't have until yesterday I didn't have wills. So do maybe we come back to this as a separate Well, let's see what a will stuff is. So, this is the I'm sorry. Yeah, you all have this in your pile with something. It has a green top on it. I remember in in trying to get on top of the wastewater treatment plant so there were…
Board of Trustees Workshop Meeting
Board meeting · Oct 7, 2026
RFP published
Proposals due (26 days left)
So originally we were looking for about $400,000 ability to borrow up to $400,000. Um and right now in the planning phase there's only a few projects that will have concrete numbers for better not concrete but better engineering estimates for um and under bond council's recommendation you should really have good engineering documents before borrow before…