State AgencyIL
Posted
-
Dec 2, 2026
IDOT National Trail Rest Area RFP
Commissioning of two permanent, original public artwork installations for the lobby walls of the IDOT National Trail Rest Area in Effingham County, Illinois.
Description: The Iowa DOT is seeking competitive bids for the removal and replacement of the surface tile/stucco insulation system on the DOT Tiffin Rest Area East Bound building.
StateAgency · IA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Iowa Department of Transportation.
Adjacent opportunities open for bidding right now.
State AgencyIL
Posted
-
Dec 2, 2026
Commissioning of two permanent, original public artwork installations for the lobby walls of the IDOT National Trail Rest Area in Effingham County, Illinois.
Illinois Capital Development Board
State AgencyIL
Posted
-
Nov 18, 2026
Construct new rest area.
Special DistrictWA
Posted
-
Oct 29, 2026
Contract for removal and replacement of select exterior building components of buildings 12, 22, and 28. Each building has its own bid set drawings for details. Key requirements include a good faith asbestos inspection and testing to comply with rcw 49. 26. 013. Excavation is required to install continuous waterproofing and rigid insulation at below-grade concrete walls. Additional tasks include removing and replacing bathroom vents to meet code, installing 1" rigid insulation on building surfaces, adding 2" rigid insulation at the foundation, installing new 6' tall aluminum horizontal slat privacy patio fencing, and replacing all downspouts. Interior protections must be set up, and surface-mounted electrical lines must be rerouted into wall cavities. Field painting covers fiber cement siding, trim, doors, eaves, and handrails.
Illinois Department of Transportation
State AgencyIL
Posted
Oct 2, 2026
Nov 6, 2026
Illinois Department of Transportation contract 078-70I06 concerns removal and replacement of lighting at both the eastbound and westbound Farmland Rest Areas in DeWitt County. The I-74 project’s listed work includes electrical service, conduit, LED luminaires, lighting structures and removal of existing equipment. The contract is scheduled for the November 6, 2026 letting, but plans and special provisions were not yet available on the posting.