Higher EducationSC
Posted
Oct 20, 2026
Nov 17, 2026
Residential laundry service for student Housing RFP
This Invitation for Bid is for residential laundry services for student housing.
Description: Work may include wastewater lateral repairs or replacements, connections, excavation, restoration, and authorized septic improvements
SpecialDistrict · NY, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Higher EducationSC
Posted
Oct 20, 2026
Nov 17, 2026
This Invitation for Bid is for residential laundry services for student housing.
CityFL
Posted
-
Dec 10, 2026
The project encompasses the extension of the municipal wastewater collection system, including the furnishing of all labor, materials, equipment, management, administration, supervision, and services necessary to construct, start up, and warranty a low-pressure sewer system and conventional gravity sewer system. Key construction elements involve installing 8" gravity sewer piping, sanitary sewer manholes, a duplex wastewater lift station, a 6" HDPE force main, a 12" HDPE force main with flushing stations, shutoff valves, and air release valves, 2" to 4" HDPE low-pressure sewer force mains, directional boring under major roadways, abandonment of existing septic systems, installation of 6" gravity service laterals, packaged simplex and duplex grinder pump stations, electrical service connections, a diesel engine-generator set with an automatic transfer switch, and as- built documentation.
Posted
Nov 3, 2026
Nov 23, 2026
Work includes residential repair.
CityMI
Posted
Oct 26, 2026
Nov 18, 2026
The scope of work requires the contractor to perform total structure demolition, including asbestos determination and removal, black mold remediation following safety protocols, and clearing all trash, junk, and tagged vegetation from the property. The contractor must secure a demolition permit, handle and pay for all utility disconnects after notifying "MISS DIG", and strictly comply with Part 91 erosion control provisions. All slabs, foundations, and footings must be completely removed to a depth of 42" below grade, leaving only the driveway approaches unless commercial parking lots are also ordered removed. Finally, the contractor must pass a mandatory backfill inspection, compact the excavated area to grade with clean fill, pass a final inspection, and restore all affected private property and public rights-of-way with seed and straw.