CityTX
Posted
Oct 27, 2026
Dec 8, 2026
Pavement Rehabilitation District 1 RFP
Work includes 124,039 SY milling & edge milling (0" to 3"), 130,039 SY 2" d-gr hmac ty-d sac b pg 64-22 (overlay), 4,165 gal prime coat (ae-p or mc-300)(0. 15 gal/sy residual min), 19,291 gal bonding course (trail hot asphalt) (0. 19 gal/sy), 87 EA manhole lid height adjustment a/b , 105 ea valve box height adjustment a/b, 29 EA replace old style valve box cover and can and install concrete diamonds, replacement of existing sanitary sewer (4"-8") with 8" sdr-26 pvc, depth 10'. See attached file.
