Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of De Queen, Arkansas is soliciting engineering services for SCADA Integration Services for a water system improvement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide professional services related to PLC/SCADA system integration, OIT programming/development, and startup troubleshooting during the construction phase of the District's Water Resource Recovery Facility (WRRF) Improvement Project (Project). The primary responsibility of the selected PLC/SCADA integrator will be to integrate process equipment and instruments into the PLC/SCADA system in strict accordance with all applicable project specifications, industry standards (e.g., NFPA, ISA), and regulatory requirements to ensure full functional compatibility and integrity throughout the construction and operational processes. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 28, 2026
Provide professional services related to PLC/SCADA system integration, OIT programming/development, and startup troubleshooting during the construction phase of the District's Water Resource Recovery Facility (WRRF) Improvement Project (Project). The primary responsibility of the selected PLC/SCADA integrator will be to integrate process equipment and instruments into the PLC/SCADA system in strict accordance with all applicable project specifications, industry standards (e.g., NFPA, ISA), and regulatory requirements to ensure full functional compatibility and integrity throughout the construction and operational processes. See attached file.
AvailableProvide NG SCADA integration contractor.
Posted Date
Jan 15, 2026
Due Date
Jan 29, 2026
Release: Jan 15, 2026
Close: Jan 29, 2026
Provide NG SCADA integration contractor.
AvailableThis Request for Qualifications is for engineering services to support the implementation of approved FY 2026 Community Development Block Grant (CDBG) project(s), covering everything from preliminary design and cost estimates to project closeout, including bid process support, contract execution, and construction inspection.
Posted Date
Jan 22, 2026
Due Date
Feb 17, 2026
Release: Jan 22, 2026
Close: Feb 17, 2026
This Request for Qualifications is for engineering services to support the implementation of approved FY 2026 Community Development Block Grant (CDBG) project(s), covering everything from preliminary design and cost estimates to project closeout, including bid process support, contract execution, and construction inspection.
AvailableElectrical and SCADA integration. Unclassified excavation, concrete equipment slab, chain link fencing, erosion control, traffic control, and turf restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 28, 2026
Release: Dec 16, 2025
Close: Jan 28, 2026
Electrical and SCADA integration. Unclassified excavation, concrete equipment slab, chain link fencing, erosion control, traffic control, and turf restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →