Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide NG SCADA integration contractor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Electrical and SCADA integration. Unclassified excavation, concrete equipment slab, chain link fencing, erosion control, traffic control, and turf restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 28, 2026
Release: Dec 16, 2025
Close: Jan 28, 2026
Electrical and SCADA integration. Unclassified excavation, concrete equipment slab, chain link fencing, erosion control, traffic control, and turf restoration.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of fiber optic communication infrastructure and SCADA integration serving water utility facilities. The work includes furnishing and installing network/SCADA enclosures, communication hardware, fiber optic terminations, conduit connections, integrations with existing metersite fiber, and modifications to the city s existing water utilities SCADA production environment.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
Installation of fiber optic communication infrastructure and SCADA integration serving water utility facilities. The work includes furnishing and installing network/SCADA enclosures, communication hardware, fiber optic terminations, conduit connections, integrations with existing metersite fiber, and modifications to the city s existing water utilities SCADA production environment.
Provide professional services related to PLC/SCADA system integration, OIT programming/development, and startup troubleshooting during the construction phase of the District's Water Resource Recovery Facility (WRRF) Improvement Project (Project). The primary responsibility of the selected PLC/SCADA integrator will be to integrate process equipment and instruments into the PLC/SCADA system in strict accordance with all applicable project specifications, industry standards (e.g., NFPA, ISA), and regulatory requirements to ensure full functional compatibility and integrity throughout the construction and operational processes. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Provide professional services related to PLC/SCADA system integration, OIT programming/development, and startup troubleshooting during the construction phase of the District's Water Resource Recovery Facility (WRRF) Improvement Project (Project). The primary responsibility of the selected PLC/SCADA integrator will be to integrate process equipment and instruments into the PLC/SCADA system in strict accordance with all applicable project specifications, industry standards (e.g., NFPA, ISA), and regulatory requirements to ensure full functional compatibility and integrity throughout the construction and operational processes. See attached file.
AvailableThe installation of a new Supervisory Control and Data Acquisition (SCADA) communication tower. The awarded contractor shall provide all materials, equipment, supervision and labor. The scope of work will also include the complete removal of existing communication equipment.
Posted Date
Dec 12, 2025
Due Date
Jan 28, 2026
Release: Dec 12, 2025
Close: Jan 28, 2026
The installation of a new Supervisory Control and Data Acquisition (SCADA) communication tower. The awarded contractor shall provide all materials, equipment, supervision and labor. The scope of work will also include the complete removal of existing communication equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →