REQUEST FOR QUALIFICATIONS
DeFuniak Springs Reconnecting Communities Pilot Project
RFQ NO: 2026-02-PW
Description: The City is soliciting qualifications from firms or individuals to prepare for final design, engineering, and capital construction of an extensive network of non-motorized, multi-use trails to improve pedestrian and bicycle access in Downtown DeFuniak Springs. The work includes studies, community engagement, surveys, site assessments, preliminary and conceptual design and engineering, environmental and railroad right-of-way assessments, and development of a transect-based Complete Streets policy with associated comprehensive plan updates. Deliverables will include conceptual layouts and 3D renderings, public workshops and outreach, identification of deficiencies in pedestrian/cyclist infrastructure, and preliminary cost and geotechnical information to enable future final design and construction phases.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
This task includes refining the planning process, clarifying tasks, identifying timelines, and processes for communication between project managers, committees, key community partners, and the consultant team.
The City is procuring engineering design, permitting support, and field survey services to extend a natural gas main to the Mineral Springs area. The project entails design of approximately 17,050 linear feet of 4-inch diameter plastic (HDPE) natural gas main along Roscoe Howey Rd, New Town Rd, and Clarence Secrest Rd to create a two-way feed into the area. Scope includes project management, natural resources services, pipeline design, and permitting services to obtain required approvals for construction.
Request for qualifications for Engineer of Record professional services for the 2026-2027 school year.
The City of Duluth is soliciting a consultant to develop the Duluth I-35 Community Access Revitalization Plan through an FHWA Reconnecting Communities Pilot Community Planning Grant with focus areas in West Duluth and Downtown Duluth. The selected consultant will lead extensive community engagement, analyze existing conditions and markets, generate and refine multiple community design scenarios (street-level 2D/3D visualizations), and advance selected scenarios to conceptual designs. Final deliverables include reports (existing conditions, case studies, market study), visualizations and conceptual designs, an implementation blueprint with funding and cost estimates, and all project files, with project completion targeted for December 29, 2028.
Key Contacts on this RFP
Decision makers connected to this RFP from City of DeFuniak Springs.
KTKoby TownsendCity Manager / CRA Executive Director
*******@************
+1 (***) ***-****
RFP documents & timeline
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
120 days before RFP
The City Council authorized the City Manager to execute a concurrence letter and transmit the Council's preferred West Alternative A and East Alternative A for the planned multi-use path to FDOT.
See sourceHide source
Mayor B. Campbell said all right. We have a motion and a second. City Manager K. Townsend stated so to clarify, we are approving me to sign this concurrent letter concurrence letter and then to provide to FDOT the minutes of this meeting along with the council's preferred layout which is West Alternative A and East Alternative A. Councilmember D. Cosson…
DeFuniak Springs City Council Regular Meeting Minutes
The CRA Board approved Option Three for downtown alleyway redevelopment from 11th to 4th Street, with approximately $3.4 million budgeted for the next fiscal year.
See sourceHide source
3C1. DOWNTOWN ALLEYWAY REDEVELOPMENT - DESIGN MILESTONE #1 Executive Director Koby Townsend stated that there are three design layout options, along with a cost breakdown for each option. All three designs extend from 11th Street to 4th Street. He stated that the purpose of the discussion is to receive direction from the Board on which layout is preferred…
Board meeting
84 days before RFP
The CRA Board approved Three Notch's reinitiation of the railroad pedestrian-crossing redevelopment design, including consideration of a pedestrian crossing at Crescent Drive.
See sourceHide source
3C2. REQUEST TO REINITATE RAILROAD PEDESTRIAN CROSSINGS Executive Director Koby Townsend stated that this project has been on pause and that he would like Three Notch to reinitiate the project. He stated that it is highly likely that the Crescent Drive railroad crossing will be closed to vehicular traffic but will remain open as a pedestrian crossing.…
Community Redevelopment Agency Regular Meeting Minutes
Board meeting
43 days before RFP
The City was coordinating an FDOT/TPO workshop and exploring alternative routes for the proposed multi-use path, including options along U.S. Highway 90.
See sourceHide source
Kenan Powell expressed concerns regarding the proposed multi-use path through the lakeyard. particularly tree removal and potential flooding, and requested a public workshop. Councilmember T. Bierbaum confirmed that a workshop is being coordinated with FDOT and the TPO and that alternative routes avoiding the lakeyard are being explored, including options…