Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Gateway Development Commission (GDC) is soliciting qualifications for heavy civil construction work on the 10th Avenue Tunnel and related activities within A-Yard as part of the Hudson Tunnel Project (Package P2A). This RFQ is the first step in a two-step best-value procurement to pre-qualify firms that will be invited to a later RFP, with work expected to begin in 2027. The posting was listed as open with a response deadline of March 13, 2026 and an estimated value range of $500M–$1B.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes heavy civil work for the tunnel and within a-yard. Work will be executed on 10th avenue from street level and within a-yard at track level. Principal elements of the work include: construction of a cut-and-cover tunnel under 10th avenue, connecting the existing hudson yards concrete casing section 1 ("hycc-1") with a-yard, approx. 100' long. Underpinning the existing 450 west 33rd street overbuild structure and the relocation of its structural columns and the ps-5 structure to accommodate the future track alignment. Construction of the a-yard fan plant structural framing. See attached file.
Posted Date
Jan 21, 2026
Due Date
Mar 13, 2026
Release: Jan 21, 2026
Close: Mar 13, 2026
Work includes heavy civil work for the tunnel and within a-yard. Work will be executed on 10th avenue from street level and within a-yard at track level. Principal elements of the work include: construction of a cut-and-cover tunnel under 10th avenue, connecting the existing hudson yards concrete casing section 1 ("hycc-1") with a-yard, approx. 100' long. Underpinning the existing 450 west 33rd street overbuild structure and the relocation of its structural columns and the ps-5 structure to accommodate the future track alignment. Construction of the a-yard fan plant structural framing. See attached file.
AvailableShortlist Proposers for the Package 2A - 10th Ave. Tunnel and A-Yard. Principal elements of the work include: Construction of a cut-and-cover tunnel under 10th Avenue, connecting the existing Hudson Yards Concrete Casing Section 1 ("HYCC-1") with A-Yard, approximately 100' long. Underpinning the existing 450 West 33rd Street overbuild structure and the relocation of its structural columns and the PS-5 structure to accommodate the future track alignment. Construction of the A-Yard Fan Plant structural framing. Future track alignment and systems fit out work in the 10th Avenue Tunnel and A-Yard (P2A) and fit out of the A-Yard Fan Plant will be constructed in a subsequent HTP contract referred to as Package P2B.
Posted Date
Jan 23, 2026
Due Date
Mar 13, 2026
Release: Jan 23, 2026
Close: Mar 13, 2026
Procurement of professional architectural and engineering services for the design of an armored channel/berm system, drainage facilities, and a mass grading plan, including commercial mineral extraction, for flood control at Nevada State University.
Posted Date
Nov 21, 2025
Due Date
Feb 6, 2026
Release: Nov 21, 2025
Close: Feb 6, 2026
Procurement of professional architectural and engineering services for the design of an armored channel/berm system, drainage facilities, and a mass grading plan, including commercial mineral extraction, for flood control at Nevada State University.
AvailableGuaranteed energy savings contract.
Posted Date
Jan 20, 2026
Due Date
Feb 6, 2026
Release: Jan 20, 2026
Close: Feb 6, 2026
Guaranteed energy savings contract.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Shortlist Proposers for the Package 2A - 10th Ave. Tunnel and A-Yard. Principal elements of the work include: Construction of a cut-and-cover tunnel under 10th Avenue, connecting the existing Hudson Yards Concrete Casing Section 1 ("HYCC-1") with A-Yard, approximately 100' long. Underpinning the existing 450 West 33rd Street overbuild structure and the relocation of its structural columns and the PS-5 structure to accommodate the future track alignment. Construction of the A-Yard Fan Plant structural framing. Future track alignment and systems fit out work in the 10th Avenue Tunnel and A-Yard (P2A) and fit out of the A-Yard Fan Plant will be constructed in a subsequent HTP contract referred to as Package P2B.