School DistrictTX
Posted
Oct 5, 2026
Oct 19, 2026
HGA Demolition of 3 Buildings (Request for Proposal)
Project consists of demolition of 3 buildings and surrounding elements.
Description: Procurement of demolition services for three buildings and surrounding elements, with an optional alternate bid for irrigation, new soil, and sod.
School · TX, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Houston Gateway Academy.
Adjacent opportunities open for bidding right now.
School DistrictTX
Posted
Oct 5, 2026
Oct 19, 2026
Project consists of demolition of 3 buildings and surrounding elements.
Connecticut Office of Early Childhood
State AgencyCT
Posted
-
Nov 9, 2026
Connecticut’s Office of Early Childhood is seeking providers for Birth to Three services, including comprehensive early-intervention programs and specialized Deaf/Hard of Hearing support. The announcement states that OEC plans to invest up to $199,568,130 over five years to build a statewide system serving approximately 15,000 children annually and grounded in IDEA Part C requirements. Proposals are due November 9, 2026; the announcement does not specify a submission time.
School DistrictTX
Posted
Sep 28, 2026
Oct 13, 2026
Work includes, but is not limited to, installation of fifteen (15) welding training stations, one (1) horizontal band saw, fifteen (15) handheld angle grinders, general power distribution, general lighting, local welding fume extraction, mechanical equipment, life safety devices, accessibility improvements, and associated architectural, mechanical, electrical, and incidental structural work
CityTX
Posted
Sep 16, 2026
Oct 8, 2026
The project generally consists of selective interior demolition of an approximately 5,900 SF, one-story existing building, including removal and disposal of designated interior walls, beams, flooring, and other interior components; salvage and onsite storage of designated brick; protection of existing exterior walls, windows, restroom facilities, electrical and plumbing systems; and all temporary shoring, bracing, protection, cleanup, disposal, and incidental work necessary to complete the demolition as shown in the Contract Documents.