CityFL
Posted
Oct 13, 2026
Nov 17, 2026
Description: Design, supply, factory acceptance testing, delivery, commissioning support, and operator training for containerized battery energy storage systems in Noorvik, Kiana, and Ambler, Alaska.
County · AK, US
Decision makers connected to this RFP from Northwest Arctic Borough.
Adjacent opportunities open for bidding right now.
CityFL
Posted
Oct 13, 2026
Nov 17, 2026
From the first pre-RFP signals to the published RFP and its files.
Board meeting
435 days before RFP
The OCED programme recorded an obligated award for proposed regional solar PV and 16.5 MWh of BESS, with $9,198,251 accessible in phase one and work started.
OCED Project This project, "Solar PV, Battery Storage and Heat Pumps in Northwest Arctic Alaska," proposes to install 3.35 MW of solar PV and 16.5 MWh of battery storage across all eleven villages of the northwest Arctic region, displacing an estimated 322,000 gallons of diesel fuel annually. Additionally, this project proposes to install 860 heat pumps,…
Request for proposals for the supply and delivery of asphalt millings.
Special DistrictCA
Posted
Oct 6, 2026
Nov 17, 2026
Preferred portfolio includes the addition of tranches of solar paired with 8-hour storage in a 1-to-1 ratio, as well as out-of-state wind, by 2040.
New York State Energy Research and Development Authority
State AgencyNY
Posted
Jul 10, 2026
Feb 19, 2027
Central Hudson Gas and Electric Corporation is seeking offers from developers for scheduling and dispatch rights to new front-of-the-meter, bulk-connected energy-storage projects in its service territory that must be operational by December 31, 2030. The RFP targets at least 10 MW through energy storage services agreements of up to 15 years, and successful projects may receive New York State Energy Research and Development Authority (NYSERDA) Market Acceleration Bulk Incentive funding. The process has two rounds: Round 1 offers were due September 14, 2026, and Round 2 offers are limited to successful Round 1 bidders and due February 19, 2027, at 5 PM EPT.
Special DistrictOR
Posted
Nov 3, 2026
Jan 12, 2027
Provide support for the Resilient Lane project, with a focus on tehcnical support for multiple project areas.
Northwest Arctic Borough Mtg Packet
Board meeting · Aug 13, 2025
Board meeting
191 days before RFP
NAB reported DOE intent to fund a proposed Ambler 234-kW PV and 384-kW LFP BESS project seeking construction in summer/fall 2027-28.
Ambler Solar Battery project 234kw PV and 384kw LFP BESS We wrote a TEDO (DOE tribal grants) proposal for Ambler for 2023-24, to construct a Solar PV and Battery solution for them. It's a request for $ 3,435,988 with an inkind match of $ 381,865.00 DOE has notified us of intent to fund this, and the last paperwork has been completed including the…
Northwest Arctic Borough Assembly Regular Meeting
Board meeting · Apr 14, 2026
Ambler Solar Battery project 234kw PV and 384kw LFP BESS/30kw heating loop We wrote a TEDO (DOE tribal grants) proposal for Ambler for 2023-24, to construct a Solar PV and Battery solution for them. It's a request for $ 3,435,988 with an inkind match of $ 381,777.00 DOE has notified us of intent to fund this and the last paperwork has been completed…
Northwest Arctic Borough Mtg Packet
Board meeting · Aug 25, 2025
Budget amendment
58 days before RFP
The FY26 amended budget approved $1,000,000 for OCED solar-battery grant matches and $81,770 for DOE/OIE Ambler Solar.
Transfers from General Fund APPROVED $ Variance % Variance ACCT Description PROPOSED FY26 FY26 Favorable Favorable AMEND 2 AMEND 1 (Unfavorable) (Unfavorable) INVESTMENT CONTRIBUTION9002 6,600,000 6,600,000 0% BOND DEBT APPROPRIATION9003 1,533,000 1,533,000 0% 9004TRANSFER OUT GRANTS 2,547,770 2,547,770 TOTAL $ 10,680,770 $ 10,680,770 $$ 0% Sulianich…
Northwest Arctic Borough FY2026 Budget Amendment (2026-08-25)
Budget amendment · Aug 25, 2026
Agenda packet
31 days before RFP
The Energy and Climate Plan listed planned 2027 installations of 1,000-kWh BESS systems in Noorvik, Ambler, and Kiana alongside community solar projects.
2026 Energy and Climate Plan Northwest Arctic Borough, Alaska Fuel Savings (gals) Period Annual Average (gals) Solar Size (kW) BESS Size (kWH) Savings (gal/kW) Shungnak 57,286 9/2021-9/2025 14,322 233 350 61.5 Noorvik 9,285 7/2017-3/2026 1,071 23 0 46.6 Buckland + Deering 12,500 11/2018-3/2026 1,705 95 18.0 Noatak 22,177 7/15/2023-8/30/2025 10,436 280 442…
Northwest Arctic Borough Meeting Packet
Agenda packet · Sep 21, 2026
Increased Solar- BESS • Implement solar-BESS in additional communities (Ambler, Selawik, Kiana, Noorvik, Kivalina, Buckland, Deering) \[Approx. $8,300 per kW of Solar PV\] • Increase sizes of existing systems (Deering, Buckland, Kotzebue, Noatak) \[Approx. $8,300 per kW of Solar PV\] • DOE OCED grant will support additional communities, 2026 -- 2029 •…
Northwest Arctic Borough Meeting Packet
Agenda packet · Sep 21, 2026
RFP published
Proposals due (9 days left)