St Lucie West Services District
Special DistrictFL
Jul 21, 2026
Closes
Aug 14, 2026
Wastewater Treatment Plant Headworks Screening System Replacement (Request for Proposals)
Wastewater treatment plant headworks screening system replacement.
Description: This RFP is for the removal, transportation, and disposal of approximately 350,000 gallons of sludge from the Village Wastewater Treatment Plant and cleaning of three sewage pump station wet wells.
City · NY, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Village of Cold Spring.
Adjacent opportunities open for bidding right now.
St Lucie West Services District
Special DistrictFL
Jul 21, 2026
Closes
Aug 14, 2026
Wastewater treatment plant headworks screening system replacement.
CityCA
Jul 13, 2026
Closes
Aug 5, 2026
Work consist of trees removal, wood chipping and haul away.
CityTX
Jul 24, 2026
Closes
Sep 3, 2026
Work includes 1 LS demolition and removal of the existing two (2) sludge holding tanks no. 110 and 120, including subgrade and concrete structures, staircases, walkway bridges and handrails, piping and mechanical equipment, wiring, conduits and electrical components, disposal of waste materials, and miscellaneous items to prepare the site for construction of new tanks. Works are not specifically itemized to be done by unit prices. Complete in place; 1 LS construction of two (2) new sludge tanks 110 and 120 structures, including but not limited to subgrade foundation work, concrete structures, staircases, walkway bridges and handrails, project sign and installation of swppp, grading and repair/replacement of sidewalk paving, including miscellaneous components that are required to complete sludge tanks 110 and 120 structures and site civil improvements. See outside link.
CityTX
Jul 7, 2026
Closes
Aug 6, 2026
Project consists of remove existing brush aeration equipment and replace with new disc aerator equipment, make structural modifications to support new aeration equipment and modify effluent weir box; remove existing chlorine disinfection equipment and replace with new chlorine disinfection equipment including scales, feeders, regulators, booster pumps and associated piping; replace electrical service entrance switchgear and construct new electrical motor control center for new and future aeration equipment.