Summary
Work includes 1 LS demolition and removal of the existing two (2) sludge holding tanks no. 110 and 120, including subgrade and concrete structures, staircases, walkway bridges and handrails, piping and mechanical equipment, wiring, conduits and electrical components, disposal of waste materials, and miscellaneous items to prepare the site for construction of new tanks. Works are not specifically itemized to be done by unit prices. Complete in place; 1 LS construction of two (2) new sludge tanks 110 and 120 structures, including but not limited to subgrade foundation work, concrete structures, staircases, walkway bridges and handrails, project sign and installation of swppp, grading and repair/replacement of sidewalk paving, including miscellaneous components that are required to complete sludge tanks 110 and 120 structures and site civil improvements. See outside link.