North Dakota Department of Transportation
State AgencyND
Posted
Oct 26, 2026
Nov 20, 2026
Structure Removal & Replacement (Request for Proposal)
Proposed work consists of 0. 2960 miles of structure removal & replacement.
Description: Work removal, replacement, and cleanup of the joint sealants at the reservoir. As well as, perform associated surface preparation for sealant and coating work on designated surfaces and appurtenances. The work includes handling and categorization of removed materials for subsequent disposal by others, confined space entry, abrasive blasting, coating application and implementation of environmental protection measures.
SpecialDistrict · CA, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
504 days before RFP
The Board approved the FY 2026-2027 biennial budget and CIP forecast, which included projected FY 2026-2030 spending for storage-reservoir rehabilitation.
The identified facility needs and the recommendations of the capital steering committee are considered during the biennial update to the CIP. The most recent CIP update was completed in 2025 in connection with developing the biennial budget for Fiscal Years 2026 and 2027, which was approved by the Board on June 10, 2025. The CIP update included a ten-year…
East Bay Municipal Utility District Board of Directors Regular Meeting
Agenda packet · Mar 24, 2026
Agenda packet
217 days before RFP
The Series 2026A green-bond project table included the Reservoir Rehabilitation & Maintenance project with $21.3 million shown as funded for rehabilitation and replacement of 166 reservoirs and pressure vessels.
East Bay Municipal Utility District Expected Series 2026A Green Bond Projects (continued) Project Name Short Description EBMUD Green Bond Criteria Amount Funded Pipeline Rebuild Pipeline Rebuild focuses on the continued replacement and renewal of distribution system pipelines that have reached the end of their useful life. This project is continuing to…
East Bay Municipal Utility District Board of Directors Regular Meeting
Agenda packet · Mar 24, 2026
RFP published
Proposals due (19 days left)
Decision makers connected to this RFP from East Bay Municipal Utility District.
Adjacent opportunities open for bidding right now.
North Dakota Department of Transportation
State AgencyND
Posted
Oct 26, 2026
Nov 20, 2026
Proposed work consists of 0. 2960 miles of structure removal & replacement.
Special DistrictCA
Posted
Sep 10, 2026
Nov 18, 2026
Construct a 2,100 acre-foot (ac-ft) off-line storage reservoir and 1.8-mile long Intake Canal. The EHR Project will provide operational storage by having the ability to divert water from the AAC, store it, and release it to the EHL Canal. The proposed reservoir will provide a non-jurisdictional maximum water storage depth of 6 feet (ft), and receive flow from the proposed Intake Canal connection at the AAC Hydro Pond. The Intake Canal will be a 1.8-mile trapezoidal-shaped lined channel with 3H:1V side slopes, and capacity of 1,500 cubic feet per second (cfs). Water from the reservoir will be released to the EHL Canal through a 1,000-foot long trapezoidal-shaped lined channel and emergency spillway with 3H:1V side slopes, and capacity of 1,000 cfs. The AAC Tie-In, reservoir inlet and outlet structures will be gated control. The reservoir will be operated to fill and release within 24-hour cycles.
Landfill Venture Group, Highway G Landfill Commission
Special DistrictWI
Posted
Oct 17, 2026
Nov 6, 2026
Remove the existing decommis sioned bioreactor.
School DistrictTX
Posted
-
Nov 9, 2026
AHU Replacement.