CityPA
Aug 4, 2026
Closes
Aug 26, 2026
Rear Entryway Concrete Steps and Handrail Replacement (Request for Proposal)
Work include complete removal and legal disposal of existing rear steps, platform, and railings; excavation and sub-base compaction with crushed stone. Concrete construction: form & pour air-entrained concrete (min. 4,000 psi) with broom finish for slip resistance and embedded steel rebar reinforcement mesh. Railing installation: design, supply, and secure anchoring of commercial-grade metal handrails (powder-coated wrought iron, steel, or aluminum) conforming to ibc and ada standards. Site restoration: daily cleanup and full restoration of adjacent lawn/pavement.