Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Leavenworth County is seeking engineering design, utility coordination, and bid document preparation services for the replacement of the F-47 Culvert, including hydraulic analysis, preliminary surveying, grading design, pavement repair, and construction details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of approx. the services of a consulting engineering firm to provide the design of construction ready plan sets for the rehabilitation/replacement of a 12x10 reinforced concrete box culvert under Murray Rd. and any/all required/associated hydraulic analysis/design necessary to achieve no rise certifications for both upstream and downstream conditions.
Posted Date
Dec 19, 2025
Due Date
Jan 30, 2026
Release: Dec 19, 2025
Close: Jan 30, 2026
Work consists of approx. the services of a consulting engineering firm to provide the design of construction ready plan sets for the rehabilitation/replacement of a 12x10 reinforced concrete box culvert under Murray Rd. and any/all required/associated hydraulic analysis/design necessary to achieve no rise certifications for both upstream and downstream conditions.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of culvert replacement.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Project consists of culvert replacement.
AvailableProfessional design engineering consultant services for a stormwater and roadway improvement project on Koepke Road, encompassing design, permitting, and construction plan preparation for storm sewer upgrades and roadway resurfacing on Koepke Road, Keystone Road, and Miller Road.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Professional design engineering consultant services for a stormwater and roadway improvement project on Koepke Road, encompassing design, permitting, and construction plan preparation for storm sewer upgrades and roadway resurfacing on Koepke Road, Keystone Road, and Miller Road.
AvailableFlume creek culvert replacement and channel restoration.
Posted Date
Jan 2, 2026
Due Date
Jan 30, 2026
Release: Jan 2, 2026
Close: Jan 30, 2026
Flume creek culvert replacement and channel restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →