Special DistrictTX
Posted
Nov 18, 2026
Dec 8, 2026
Oates to Centerville Transmission Line Construction Services (GP&L) RFP
Construction services for the Oates to Centerville transmission line for Garland Power & Light (GP&L).
Description: Award must be made to the vendor submitting the most advantageous offer considering the relative importance of price and other evaluation factors. City reserves the right to request a best and final offer upon completion of negotiations. NO FAXED OR EMAILED BIDS! All documents (forms) herein and attached are required to be completed and returned with response. All questions must be answered within the Ion Wave Question & Answer segment. No emailed, faxed or phone call question related to this bid will be responded to. The deadline for submitting questions on this bid is December 4, 2026 at 5:00 p.m. This is an evaluated bid. Please pay close attention to the GP&L Construction Contractor Questionnaire and Pricing Grading Sheet and provide an organized and complete bid. A Bid Bond in the amount of 5% is required with your bid response; failure to do so will deem your bid non-responsive. A Performance, Payment and Maintenance Bond (2 yr.) will be required upon notification of award. Please acknowledge the City of Garland's Terms and Conditions in the Attributes section.
City · TX, US
Adjacent opportunities open for bidding right now.
Special DistrictTX
Posted
Nov 18, 2026
Dec 8, 2026
Construction services for the Oates to Centerville transmission line for Garland Power & Light (GP&L).
Special DistrictKS
Posted
Nov 3, 2026
Dec 15, 2026
Midwest Energy, Inc. is seeking a qualified transmission construction contractor to complete a construction and demolition project in Ellis County, Kansas consisting of 10 miles of 115kV transmission line construction, demolition of 5 miles of 115kV transmission line, and substation shielding & terminal construction at one substation as detailed in the posted project scope document. This project is being partially funded by the U.S. Department of Energy (DOE) through the Grid Resilience and Innovation Partnership (GRIP) program. Therefore, the selected contractor must accept and adhere to all applicable Federal requirements including, but not limited to the Build America, Buy America Act (BABAA) requirements set forth in Pub. L. No. 117-58, §§ 70901-52 for all materials, unless approved by a waiver, Code of Federal Regulations 2 CFR Part 200 provisions, and Davis-Bacon and Related Acts applicable to labor and wages. More information is provided in the bid package regarding Federal requirements and contract provisions. RFP Issue Date: 11/3/2026 Project information and instructions will be posted on the Midwest Energy, Inc. website until 11/25/2026. Sealed Bid Deadline: 5:00pm CST on 12/15/2026 Sealed Bid Opening: 12/16/2026 Award Date: On or before 1/8/2027 All bids must be sealed in an envelope and received by 5:00pm CST on the date listed above to: Midwest Energy, Inc. Attn: Purchasing Dept 1330 Canterbury Dr. Hays, KS 67601 If you are mailing a bid packet, we ask you to expedite or overnight the package to ensure delivery by the deadline. We will not accept bids by email. A transmission line contractor project scope document can be found on the Midwest Energy, Inc. website under the Community tab and the Bid Opportunities tab. 1. Prospective bidders may request the bid package materials including design and construction drawings, Federal grant documentation, and a contractor pre-qualification form by emailing bids@mwenergy.com. A secure link to download the bid package materials will be provided upon request. 2. Midwest Energy will conduct a pre-bid meeting on Friday, 11/20/2026 at 9:00 AM CST for interested bidders. This meeting will be conducted over Microsoft Teams. Interested bidders shall email bids@mwenergy.com to request a meeting invitation. At this time, we will give a summary of the project and take questions from bidders. 3. All bids are required to be submitted as a firm fixed price with separate pricing for each of four project phases within a single proposal. See additional proposal requirements in the provided project scope document. 4. Once bids are reviewed and the contractor to be awarded the project is selected, the construction contract will be completed and executed. The contractor may not mobilize to the site or begin any project work until the construction contract and all required preconstruction documents have been executed. If you have any questions, please reach out to bids@mwenergy.com.
Federal
Posted
Nov 16, 2026
Dec 1, 2026
Proposed procurement for NSN 5985016277936 COUPLER,TRANSMISSION L: Line 0001 Qty 1 UI EA Deliver To: By: 0166 DAYS ADO This Solicitation may result in an Automated IDC (Indefinite Delivery Contract). The term of the contract/order will be one year or until the aggregate total of orders placed against the contract/order reach 350000.00. The estimated number of orders per year is 1. The Guaranteed Minimum quantity will be 1. Items will be shipped to various CONUS and OCONUS (via consolidation and containerization point) DLA Depots. This is a source controlled drawing item. Approved source is 12457 O-SDU-2125A. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. The items furnished must meet the requirements of the drawing cited in the solicitation. Digitized drawings and Military Specifications and Standards may be retrieved, or ordered, electronically. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.
CityWY
Posted
Nov 19, 2026
Jan 5, 2027
The work will consist of installing approx. 40 LF of 6” water main, 30 LF of 8” water main, 1500 LF of 10” water main, 500 LF of 12” water main via horizontal boring, reconnecting 22 water services, installing 22 meter pits, installing 2 fire hydrants, removing and replacing miscellaneous fencing, clearing and grubbing, aggregate surfacing replacement, and various other incidental items.
Decision makers connected to this RFP from City of Garland.
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
16 days before RFP
GP&L staff recommended obtaining steel structures for the Centerville-to-Oates Road Transmission Line Upgrade through an interlocal agreement, with $4,540,316 identified within the approved $26,320,000 project budget.
PURCHASING REPORT 3.b Meeting Date: November 2, 2026 Title: GP&L Centerville to Oates Road Transmission Line Steel Structures Submitted by: Chuck Chapman, Director of Transmission Services Bid Number: REQ00003366 Strategic Focus Area: Protect Core Services Purchase Justification This request is to obtain steel structures needed for the upgrade of the GP&L…
Garland City Council Regular Meeting
Agenda packet · Nov 2, 2026
RFP published
Proposals due (11 days left)