CountyIN
Aug 25, 2026
Closes
Sep 16, 2026
Building Automation System Replacement RFP
Building automation system replacement.
Description: Replacement of the ground level air cooled chiller, all mechanical components, and a new automation system.
PoliceDepartment · AR, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Texarkana Police Department.
These related opportunities are still open for bidding.
CountyIN
Aug 25, 2026
Closes
Sep 16, 2026
Building automation system replacement.
Aug 25, 2026
Closes
Sep 1, 2026
The Department of Energy's ORNL UT-BATTELLE LLC-DOE CONTRACTOR office seeks Siemens automation equipment or a qualified equivalent for the Nonproliferation Program Office Division at Oak Ridge National Laboratory. The posting directs offerors to Attachment C—Bill of Materials for detailed specifications and lists attachments for terms and conditions, prime flowdown clauses, the bill of materials, and abbreviated representations and certifications. It is an active Combined Synopsis/Solicitation (Original), not a grant, published Aug 25, 2026 12:06 pm EDT with offers due Sep 01, 2026 05:00 pm EDT.
FederalFL
Aug 28, 2026
Closes
Sep 10, 2026
NASA Kennedy Space Center issued this combined synopsis/solicitation for one 500-ton trailer-mounted air-cooled chiller, including associated electrical cabling, chilled-water hoses, and connection hardware for existing portable-chiller connections. The commercial-item procurement includes a solicitation PDF, statement of work, firm-fixed-price template, and question/comment form, with no set-aside indicated. Offers are due September 10, 2026, at 4:30 p.m. EDT.
Charlottesville-Albemarle Airport Authority
Special DistrictVA
Aug 27, 2026
Closes
Sep 24, 2026
Project consists of replacement of existing water-cooled centrifugal chiller with new air cooled chiller; replacement of chilled water circulating pumps; replacement of air separator, expansion tank and other hydronic accessories; demolition of existing cooling tower and condenser water circulating pumps; hydronic piping modifications; electrical system modifications to support installation of new chiller equipment and pumps.