Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2 EA remove and salvage existing 4-box papi light housing assemblies, concrete foundations to remain; 2 EA remove and salvage existing 2-box papi housing assemblies, concrete foundations to remain; 4 EA remove and salvage existing papi pcu, power equipment and rack, remove concrete foundation; 545 LF remove existing conductor, conduit to remain; 3 EA new papi 2kva step-down transformer and 600v fused disconnect with frangible strut rack on new concrete pad; 1 EA new frangible strut rack on new concrete pad for papi pcu (if required). See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of professional airport engineering consulting services for the Bisbee Municipal Airport.
Posted Date
-
Due Date
Feb 24, 2026
Close: Feb 24, 2026
Procurement of professional airport engineering consulting services for the Bisbee Municipal Airport.
AvailableProvide professional engineering services for airport development projects that may include, but are not limited to, runway lighting and constant current regulator (ccr) replacement; precision approach path indicator (papi) design and installation; rotating beacon replacement; apron reconstruction design; bid and construction phase services; construction safety and phasing plan (cspp) preparation; project inspection and grant closeout; coordination with faa and adot.
Posted Date
Jul 23, 2025
Due Date
Feb 24, 2026
Release: Jul 23, 2025
Close: Feb 24, 2026
Provide professional engineering services for airport development projects that may include, but are not limited to, runway lighting and constant current regulator (ccr) replacement; precision approach path indicator (papi) design and installation; rotating beacon replacement; apron reconstruction design; bid and construction phase services; construction safety and phasing plan (cspp) preparation; project inspection and grant closeout; coordination with faa and adot.
Procurement of artists to design, fabricate, and install six public artworks for Redmond Municipal Airport's terminal expansion.
Posted Date
Jan 9, 2026
Due Date
Feb 28, 2026
Release: Jan 9, 2026
Close: Feb 28, 2026
Procurement of artists to design, fabricate, and install six public artworks for Redmond Municipal Airport's terminal expansion.
AvailableWork items include the removal and replacement of the existing papi systems (base bid), and the removal and replacement of the existing reil systems (add alt. 1).
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Work items include the removal and replacement of the existing papi systems (base bid), and the removal and replacement of the existing reil systems (add alt. 1).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis