Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work items include the removal and replacement of the existing papi systems (base bid), and the removal and replacement of the existing reil systems (add alt. 1).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and Replacement of PAPI's and Cables for Runway 9-27 at the Union County Regional Airport.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Release: Jan 12, 2026
Close: Jan 30, 2026
Removal and Replacement of PAPI's and Cables for Runway 9-27 at the Union County Regional Airport.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This solicitation (RFB-CO/OP OFFICE SUPPLIES 26-27) requests bids for office supplies through the Empire State cooperative purchasing group. Vendors must register on the BidNet Direct portal to access full solicitation documents, bid packages, and specific buyer contact information. The opportunity was posted on January 23, 2026, and remains open for bidding until March 5, 2026.
Posted Date
Jan 23, 2026
Due Date
Mar 5, 2026
Release: Jan 23, 2026
Close: Mar 5, 2026
This solicitation (RFB-CO/OP OFFICE SUPPLIES 26-27) requests bids for office supplies through the Empire State cooperative purchasing group. Vendors must register on the BidNet Direct portal to access full solicitation documents, bid packages, and specific buyer contact information. The opportunity was posted on January 23, 2026, and remains open for bidding until March 5, 2026.
AvailableWork includes 2 EA remove and salvage existing 4-box papi light housing assemblies, concrete foundations to remain; 2 EA remove and salvage existing 2-box papi housing assemblies, concrete foundations to remain; 4 EA remove and salvage existing papi pcu, power equipment and rack, remove concrete foundation; 545 LF remove existing conductor, conduit to remain; 3 EA new papi 2kva step-down transformer and 600v fused disconnect with frangible strut rack on new concrete pad; 1 EA new frangible strut rack on new concrete pad for papi pcu (if required). See attached file.
Posted Date
Dec 31, 2025
Due Date
Feb 9, 2026
Release: Dec 31, 2025
Close: Feb 9, 2026
Work includes 2 EA remove and salvage existing 4-box papi light housing assemblies, concrete foundations to remain; 2 EA remove and salvage existing 2-box papi housing assemblies, concrete foundations to remain; 4 EA remove and salvage existing papi pcu, power equipment and rack, remove concrete foundation; 545 LF remove existing conductor, conduit to remain; 3 EA new papi 2kva step-down transformer and 600v fused disconnect with frangible strut rack on new concrete pad; 1 EA new frangible strut rack on new concrete pad for papi pcu (if required). See attached file.
AvailableRemove and replace the roof estimated at approx. 8800 square feet at fire station 9. Remove and legally dispose of existing roof system (including edge metal) to the metal deck. Install tapered poly iso roof insulation system starting with r15 minimum thickness at drains. Install (per manufacturer's specifications) white, reinforced, fully adhered, 60 mil thick, tpo roof membrane system. Install required flashings for all existing roof penetrations. Fabricate and install new 24-gauge prefinished perimeter edge metal, coping and counterflashing.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Remove and replace the roof estimated at approx. 8800 square feet at fire station 9. Remove and legally dispose of existing roof system (including edge metal) to the metal deck. Install tapered poly iso roof insulation system starting with r15 minimum thickness at drains. Install (per manufacturer's specifications) white, reinforced, fully adhered, 60 mil thick, tpo roof membrane system. Install required flashings for all existing roof penetrations. Fabricate and install new 24-gauge prefinished perimeter edge metal, coping and counterflashing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →