Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $77,250, use sole source.
Coops: Forward-looking: Ask if they can buy via Ohio State Term Contracts, Statewide Contracts, ODOT Cooperative Purchasing, or NASPO ValuePoint to avoid an RFP.
City of Fostoria (OH) shows no evidence of sole source awards; deprioritize this path. City code indicates formal competitive bidding is typically required for larger purchases (over $77,250).
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Fostoria's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Finance
Cemetery and Parks Director
Director of Public Service and Safety
Law Director
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Fostoria
Work items include the removal and replacement of the existing papi systems (base bid), and the removal and replacement of the existing reil systems (add alt. 1).
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
City of Fostoria
Close: Feb 4, 2026
Work items include the removal and replacement of the existing papi systems (base bid), and the removal and replacement of the existing reil systems (add alt. 1).
AvailableCity of Fostoria
Work include excavation of approx 10 acres of the existing mosier lake to develop extended floodplain of east branch portage river including the development of an armored inlet into the existing mosier lake area from the river and outlet from mosier lake back into the river.
Posted Date
Aug 6, 2025
Due Date
Sep 8, 2025
Release: Aug 6, 2025
City of Fostoria
Close: Sep 8, 2025
Work include excavation of approx 10 acres of the existing mosier lake to develop extended floodplain of east branch portage river including the development of an armored inlet into the existing mosier lake area from the river and outlet from mosier lake back into the river.
City of Fostoria
A new splash pad and restroom building project. Trades included are site/civil, general, mechanical, plumbing and electrical. Restroom facility, pump house and concrete splash pad with installation: includes associated interior mechanical, plumbing & electrical; includes concrete splash pad, concrete deck, site work; includes engineered backfill of site excavations; includes water features and pump equipment, controls, piping and filtration. Alternate 1 - site lighting. Alternate 2 - third party & special inspections testing. Alternate 3 - sanitary sewer service from 5'-0" out - site sewer work from 5'-0" out of the restroom facility to the main. Alternate 4 - water service from 5'-0" out - site water service work from 5'-0" out of the restroom facility to the main.
Posted Date
Jan 29, 2025
Due Date
Feb 21, 2025
Release: Jan 29, 2025
City of Fostoria
Close: Feb 21, 2025
A new splash pad and restroom building project. Trades included are site/civil, general, mechanical, plumbing and electrical. Restroom facility, pump house and concrete splash pad with installation: includes associated interior mechanical, plumbing & electrical; includes concrete splash pad, concrete deck, site work; includes engineered backfill of site excavations; includes water features and pump equipment, controls, piping and filtration. Alternate 1 - site lighting. Alternate 2 - third party & special inspections testing. Alternate 3 - sanitary sewer service from 5'-0" out - site sewer work from 5'-0" out of the restroom facility to the main. Alternate 4 - water service from 5'-0" out - site water service work from 5'-0" out of the restroom facility to the main.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.