Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of fire proof panels inside the burn chamber of the district's fire training facility. The intent of this project is to design, furnish and install an engineered interior insulating system, enabling firefighters to create repeated fires to a maximum of 2000 degrees of followed by extinguishment with the use of water without damage to either the structure or the system proposed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Public Safety Training Facility Fire Training Grounds Expansion.
Posted Date
Dec 26, 2025
Due Date
Jan 29, 2026
Release: Dec 26, 2025
Close: Jan 29, 2026
Public Safety Training Facility Fire Training Grounds Expansion.
AvailableProcurement for the replacement and installation of 92 fire smoke detectors, including keyed duct detectors, DNR housing, smoke heads, sampling tubes, and test switches, compatible with Notifier Fire Panels, at the Jefferson County Correctional Facility.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
Procurement for the replacement and installation of 92 fire smoke detectors, including keyed duct detectors, DNR housing, smoke heads, sampling tubes, and test switches, compatible with Notifier Fire Panels, at the Jefferson County Correctional Facility.
AvailableReplacement of fire alarm panels, including all associated initiating devices and electrical components.
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of fire alarm panels, including all associated initiating devices and electrical components.
AvailableRemoval and replacement of the current aircraft rescue and fire fighting (ARFF) training facility and replacement in the same general area, including replacement of the existing burn pit, holding pond, control station, fuel tank, underground and aboveground fuel piping, ignitors, oil/water separator, and installation of a new decontamination area.
Posted Date
Dec 9, 2025
Due Date
Feb 27, 2026
Release: Dec 9, 2025
Close: Feb 27, 2026
Removal and replacement of the current aircraft rescue and fire fighting (ARFF) training facility and replacement in the same general area, including replacement of the existing burn pit, holding pond, control station, fuel tank, underground and aboveground fuel piping, ignitors, oil/water separator, and installation of a new decontamination area.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →