Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of Chiller #1 at Hall
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Gordon State College is requesting bids for replacement of the air-cooled chiller at Alumni Hall, including demolition of the existing unit, installation of a new air-cooled chiller, BMS integration, electrical work, protection of existing structures, and provision of temporary rental cooling during installation. A mandatory pre-bid meeting is scheduled at the Facilities conference room in Barnesville, GA on December 18, 2025 at 10:00 AM and all interested contractors must attend. The solicitation is issued under the Board of Regents of the University System of Georgia with NBP Engineers, Inc. as the design professional; bidders must meet experience, licensing, and staffing requirements.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Release: Dec 11, 2025
Close: Jan 12, 2026
Premium
Access the largest public sector contact database
Gordon State College is requesting bids for replacement of the air-cooled chiller at Alumni Hall, including demolition of the existing unit, installation of a new air-cooled chiller, BMS integration, electrical work, protection of existing structures, and provision of temporary rental cooling during installation. A mandatory pre-bid meeting is scheduled at the Facilities conference room in Barnesville, GA on December 18, 2025 at 10:00 AM and all interested contractors must attend. The solicitation is issued under the Board of Regents of the University System of Georgia with NBP Engineers, Inc. as the design professional; bidders must meet experience, licensing, and staffing requirements.
AvailableProvide Chiller Replacement .
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
Provide Chiller Replacement .
AvailableHospital chiller replacement.
Posted Date
Dec 3, 2025
Due Date
Dec 16, 2025
Release: Dec 3, 2025
Close: Dec 16, 2025
Hospital chiller replacement.
AvailableWork includes disconnecting, removal and replacement of two chillers systems, including all necessary appurtenances and components to ensure full operational functionality at city hall basement. The contractor will safely disconnect and dispose of the old equipment, following all environmental and safety rules. New chillers will be installed that meet current energy and performance standards and will connect to the building's existing systems, including the automated controls. The work also includes replacing old valves and adding a system to monitor refrigerant leaks.
Posted Date
Oct 23, 2025
Due Date
Dec 23, 2025
Release: Oct 23, 2025
Close: Dec 23, 2025
Work includes disconnecting, removal and replacement of two chillers systems, including all necessary appurtenances and components to ensure full operational functionality at city hall basement. The contractor will safely disconnect and dispose of the old equipment, following all environmental and safety rules. New chillers will be installed that meet current energy and performance standards and will connect to the building's existing systems, including the automated controls. The work also includes replacing old valves and adding a system to monitor refrigerant leaks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis