Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves the replacement of bolts and nuts on the 6", 8" and 12" water valves located on the water main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of approx. 55 LF of 12" water main, 7" temp pavement replacement, slurry backfill; 366 LF of 8" water main, 7" temp pavement replacement, slurry backfill; 1,333 LF of 8" water main, type 8 pavement replacement, granular backfill; 1,132 LF of 8" water main, type A pavement replacement, granular backfill; 288 LF of 8" water main, temp conc cap pavement replacement, granular backfill 6.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
Close: Feb 9, 2026
Work consists of approx. 55 LF of 12" water main, 7" temp pavement replacement, slurry backfill; 366 LF of 8" water main, 7" temp pavement replacement, slurry backfill; 1,333 LF of 8" water main, type 8 pavement replacement, granular backfill; 1,132 LF of 8" water main, type A pavement replacement, granular backfill; 288 LF of 8" water main, temp conc cap pavement replacement, granular backfill 6.
AvailableConstruction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Construction of water distribution system pipelines & components replacing existing water infrastructure consisting of approx 50,667 LF of 8" dia pipelines and 7,581 LF of 12" diameter pipelines. The project will include all pipes, associated valves, fittings hydrants, & water appurtenances, encasements, water service line & meter replacement, cutting & patching of streets, all testing, disinfection, swppp measures, traffic control.
AvailableAbout 10,000 LF of 8" water main replacement; 4,400 SY of 9" base concrete with 1.5" Asphalt surface, including valves, hydrants and pavement restoration.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
Close: Feb 9, 2026
About 10,000 LF of 8" water main replacement; 4,400 SY of 9" base concrete with 1.5" Asphalt surface, including valves, hydrants and pavement restoration.
AvailableWork includes approx 950 LF of watermain with flow fill; 980 LF of 4" CIP water main to 8" C900 watermain; replace one 4' sanitary sewer manhole and rehabilitate three 4' sanitary sewer manhole. Construction includes valves, manholes, air relief vaults, water and sewer service connections, curb valves, and cleanouts; roadway work consists of concrete curbs, gutters, pans, sidewalks, storm sewers, inlets. See outside link.
Posted Date
Dec 4, 2025
Due Date
Jan 30, 2026
Release: Dec 4, 2025
Close: Jan 30, 2026
Work includes approx 950 LF of watermain with flow fill; 980 LF of 4" CIP water main to 8" C900 watermain; replace one 4' sanitary sewer manhole and rehabilitate three 4' sanitary sewer manhole. Construction includes valves, manholes, air relief vaults, water and sewer service connections, curb valves, and cleanouts; roadway work consists of concrete curbs, gutters, pans, sidewalks, storm sewers, inlets. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis