Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Silverthorne seeks bids to replace and upgrade water and sewer infrastructure on Hummingbird Circle, including approximately 980 LF of 4-inch CIP water main upgraded to 8-inch C900, sanitary sewer manhole work, valves, service connections, and associated roadway and stormwater improvements. The project is advertised December 4, 2025, includes a mandatory pre-bid on January 7, 2026, and bids are due January 30, 2026 at 12:00 PM local time.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Premium
Access the largest public sector contact database
Sewer replacement 1. Vinyl plank install 2. Tub/surround replacement 3. Paint entire unit 4. Plumbing fixture and vanity replacement 5. Cabinet and countertop/sin reinstallation or replacement 6. Wiring, breaker and receptacle replacement 7. Waste line replacement.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Sewer replacement 1. Vinyl plank install 2. Tub/surround replacement 3. Paint entire unit 4. Plumbing fixture and vanity replacement 5. Cabinet and countertop/sin reinstallation or replacement 6. Wiring, breaker and receptacle replacement 7. Waste line replacement.
AvailableThe Washington Suburban Sanitary Commission (WSSC) is soliciting sealed bids for the Cheverly Phase I and Phase II Water Main Replacement project in Prince George's County, Maryland, involving replacement of multiple miles of 8"–12" water mains and associated service connections across specified streets. Sealed bids are due electronically via WSSC's eProcurement Portal by 2026-01-06 at 14:00 (local time), and the solicitation includes bidder experience, bonding, insurance, MBE/SLBE goals, and prevailing wage requirements.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
The Washington Suburban Sanitary Commission (WSSC) is soliciting sealed bids for the Cheverly Phase I and Phase II Water Main Replacement project in Prince George's County, Maryland, involving replacement of multiple miles of 8"–12" water mains and associated service connections across specified streets. Sealed bids are due electronically via WSSC's eProcurement Portal by 2026-01-06 at 14:00 (local time), and the solicitation includes bidder experience, bonding, insurance, MBE/SLBE goals, and prevailing wage requirements.
AvailableSewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
Posted Date
Nov 20, 2025
Due Date
Dec 23, 2025
Release: Nov 20, 2025
Close: Dec 23, 2025
Sewer replacement work on Central Street that includes the replacement of ductile iron water mains; replacement of vitrified clay sewer pipes; replacement of water services and sewer laterals from the main to the back of sidewalk; replacement of hydrants, butterfly valves, and all other applicable water and sewer appurtenant work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis