Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work for this project shall include, but not be limited to the following summary: 6" polyethylene gas main, open cut or hdd bore (17,100 LF), 6" hdd bores (3,500 LF), 6" pipeline crossing (160 LF), 6" ball valves (8 EA), 6"hot tap fittings, (2 EA), 3/4" or 1/2" service taps & connections (17 EA), pipeline markers (80 EA), purge, & blowdown (1 LS), temporary silt fence (1,200 LF), seeding & mulching (34,200 SY ).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide Construction Management Services for Wastewater Treatment Facility Expansion - Phase 3A, 3C, and 3D Projects.
Posted Date
Nov 24, 2025
Due Date
Feb 4, 2026
Release: Nov 24, 2025
Close: Feb 4, 2026
Provide Construction Management Services for Wastewater Treatment Facility Expansion - Phase 3A, 3C, and 3D Projects.
AvailableReplacement of existing 36" steel casing, spray foam insulation, and 30" HDPE pipe with new 24" restrained ductile iron pipe, wax tape, 5" thick Foamglas insulation, and heavy duty protective UV resistant outerwrap across the Provo River utility bridge.
Posted Date
Dec 16, 2025
Due Date
Jan 12, 2026
Release: Dec 16, 2025
Close: Jan 12, 2026
Replacement of existing 36" steel casing, spray foam insulation, and 30" HDPE pipe with new 24" restrained ductile iron pipe, wax tape, 5" thick Foamglas insulation, and heavy duty protective UV resistant outerwrap across the Provo River utility bridge.
AvailableUAB Education and Engineering Phase II - Exterior Envelope Replacement and Renovations .
Posted Date
Aug 27, 2025
Due Date
Jan 29, 2026
Release: Aug 27, 2025
Close: Jan 29, 2026
UAB Education and Engineering Phase II - Exterior Envelope Replacement and Renovations .
AvailablePump station phase III, equipment addition, 96" discharge pipe. The work generally consists of installation of steel sheet pile shoring system.
Posted Date
Dec 25, 2025
Due Date
Jan 19, 2026
Release: Dec 25, 2025
Close: Jan 19, 2026
Pump station phase III, equipment addition, 96" discharge pipe. The work generally consists of installation of steel sheet pile shoring system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis