Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump station phase III, equipment addition, 96" discharge pipe. The work generally consists of installation of steel sheet pile shoring system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
30" Ductile Iron Pipe 48 LF, 3" Ductile Iron Pipe 3 LF, 24" x 18" Reducer 2 EA, 18" Spring Check Valve 2 EA, Service (Wye) Connection, 30" x 24" 2 EA, 30" 90° Bend 2 EA, 18" 11.25 degree Bend 1 EA, 30" Blind Flange 1 EA, Connection to Existing Structure 1 EA, Demolition of Existing Pipes 1 LS.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
30" Ductile Iron Pipe 48 LF, 3" Ductile Iron Pipe 3 LF, 24" x 18" Reducer 2 EA, 18" Spring Check Valve 2 EA, Service (Wye) Connection, 30" x 24" 2 EA, 30" 90° Bend 2 EA, 18" 11.25 degree Bend 1 EA, 30" Blind Flange 1 EA, Connection to Existing Structure 1 EA, Demolition of Existing Pipes 1 LS.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailableProcurement for a generator addition at the Oak Hollow Pump Station, including specifications for cable splicing and testing.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Procurement for a generator addition at the Oak Hollow Pump Station, including specifications for cable splicing and testing.
AvailableRelease: Dec 23, 2025
Close: Jan 20, 2026
Pump station rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →