Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump station rehabilitation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes demolition and replacement of three horizontal split case pumps and installation of one additional horizontal split case pump, including all associated valves, piping, and appurtenances. The project also includes installation of a new room within the pump station to house new vfds, demolition and replacement of the HVAC system within the pump station, demolition and replacement of large diameter yard piping, valves, and appurtenances, and modifications to the sanitary sewerage system. All supporting civil, structural, plumbing, electrical, and instrumentation work is also included in the project. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 20, 2026
Release: Dec 9, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition and replacement of three horizontal split case pumps and installation of one additional horizontal split case pump, including all associated valves, piping, and appurtenances. The project also includes installation of a new room within the pump station to house new vfds, demolition and replacement of the HVAC system within the pump station, demolition and replacement of large diameter yard piping, valves, and appurtenances, and modifications to the sanitary sewerage system. All supporting civil, structural, plumbing, electrical, and instrumentation work is also included in the project. See outside link.
AvailableThe Erie County Water Authority seeks contractors to perform Phase 1 rehabilitation of the Ball Pump Station, including replacement and installation of pumps, VFDs, HVAC, large-diameter yard piping, valves, and related civil/structural/electrical/instrumentation work. The contract performance is through January 20, 2026, with estimated value $1,000,000–$5,000,000 (AI estimate) and MWBE participation goal of 10%. The opportunity was posted Dec 9, 2025 and has a response deadline of Jan 20, 2026; the original posting is on the New York State Contract Reporter (link requires sign-in to view full details).
Posted Date
Dec 9, 2025
Due Date
Jan 20, 2026
Release: Dec 9, 2025
Close: Jan 20, 2026
The Erie County Water Authority seeks contractors to perform Phase 1 rehabilitation of the Ball Pump Station, including replacement and installation of pumps, VFDs, HVAC, large-diameter yard piping, valves, and related civil/structural/electrical/instrumentation work. The contract performance is through January 20, 2026, with estimated value $1,000,000–$5,000,000 (AI estimate) and MWBE participation goal of 10%. The opportunity was posted Dec 9, 2025 and has a response deadline of Jan 20, 2026; the original posting is on the New York State Contract Reporter (link requires sign-in to view full details).
AvailableLake Houston Pump Station Pumps, Motors and Variable Frequency Drives.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Lake Houston Pump Station Pumps, Motors and Variable Frequency Drives.
AvailablePump station phase III, equipment addition, 96" discharge pipe. The work generally consists of installation of steel sheet pile shoring system.
Posted Date
Dec 25, 2025
Due Date
Jan 19, 2026
Release: Dec 25, 2025
Close: Jan 19, 2026
Pump station phase III, equipment addition, 96" discharge pipe. The work generally consists of installation of steel sheet pile shoring system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →