Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
San Jacinto River Authority
Provide on-call services for water conveyance systems, embankments and dirt work.
Posted Date
Jul 17, 2026
Due Date
Aug 14, 2026
Release: Jul 17, 2026
San Jacinto River Authority
Close: Aug 14, 2026
Provide on-call services for water conveyance systems, embankments and dirt work.
AvailableSan Jacinto River Authority
Seeking qualifications based responses to contract with professional consultant to provide professional consulting services for industrial pretreatment services.
Posted Date
Jul 10, 2026
Due Date
Aug 5, 2026
Release: Jul 10, 2026
San Jacinto River Authority
Close: Aug 5, 2026
Seeking qualifications based responses to contract with professional consultant to provide professional consulting services for industrial pretreatment services.
AvailableSan Jacinto River Authority
The San Jacinto River Authority (SJRA) is soliciting qualifications for Dam Safety Engineering Services (RFQ No. 26-0038) to provide on-call dam safety engineering support over a three-year term for Lake Conroe Dam, Bear Branch Dam, and Highlands Reservoir Dam. A non-mandatory pre-submittal conference is scheduled for July 7, 2026, and respondents are required to submit a Statement of Qualifications plus the Certification/Acknowledgement and Conflict of Interest Questionnaire. This procurement is a Request for Qualifications (professional services), not a grant, and the buyer’s posting lists attachments (RFQ document, sample PSA, COIQ) that require login to view publicly.
Posted Date
Jun 23, 2026
Due Date
Jul 23, 2026
Release: Jun 23, 2026
San Jacinto River Authority
Close: Jul 23, 2026
The San Jacinto River Authority (SJRA) is soliciting qualifications for Dam Safety Engineering Services (RFQ No. 26-0038) to provide on-call dam safety engineering support over a three-year term for Lake Conroe Dam, Bear Branch Dam, and Highlands Reservoir Dam. A non-mandatory pre-submittal conference is scheduled for July 7, 2026, and respondents are required to submit a Statement of Qualifications plus the Certification/Acknowledgement and Conflict of Interest Questionnaire. This procurement is a Request for Qualifications (professional services), not a grant, and the buyer’s posting lists attachments (RFQ document, sample PSA, COIQ) that require login to view publicly.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from San Jacinto River Authority
The 2015 Lake Conroe Watershed Protection Plan, developed by the San Jacinto River Authority, aims to maintain and improve the excellent water quality conditions in Lake Conroe. The plan focuses on addressing potential pollution from stormwater runoff, wastewater treatment plants, on-site sewage facilities (OSSFs), construction sites, and litter. Key strategies include stringent OSSF regulation, improved stormwater controls for new developments, enhanced compliance and enforcement of existing permits, and continuous public education and outreach. The plan emphasizes collaborative stakeholder engagement to achieve its goals and ensures ongoing monitoring and periodic review.
The board meeting included updates from the General Manager and the Director of Communications, alongside presentations regarding 10-year project plans for the Highlands, Lake Conroe, and Water Supply Planning divisions. Key agenda items featured authorization for the General Manager to execute various service agreements, including water supply contract amendments, granular activated carbon exchange services, easement maintenance and clearing, and sludge hauling services. Additionally, the Board considered a construction contract for water well rehabilitation and held an executive session to consult with attorneys on litigation matters and discuss real property issues, specifically regarding easements in the Cape Conroe Subdivision.
The board meeting included a work session with updates from the General Manager, Director of Communications and Public Affairs, and information regarding Lake Conroe Beach Park Operations and 10-year project plans for GRP and Woodlands divisions. Consent agenda items included approval of unaudited financials, renewal of financial audit services, approval of a medical and pharmacy benefits plan, and various contract amendments and renewals for maintenance and engineering services. Regular agenda items featured the adoption of board governance policies and bylaws, an amended investment policy, authorization for grant applications for infrastructure improvements, and approval of an amended operating budget for the Woodlands division. Additionally, the board discussed executive session items including litigation, real estate matters, and security devices, and approved the sale of a real property tract.
The committee reviewed the GRP FY27 operating budget and rate order, including allocations for surface water production and pumpage, and discussed the 10-year project plan for the GRP division, which covers infrastructure maintenance, treatment plant capacity optimization, and various transmission line relocation and repair projects. Additionally, maintenance projects such as roof repairs, electrical system testing, water receiving facility renewal, and HVAC renewal were reviewed alongside projected capital improvement costs.
The board meeting included a work session covering departmental updates, the Sunset Commission's recommendations, and a presentation of the management audit. The consent agenda included approval of landscaping services, engineering amendments for levee improvements, and design services for elevated storage tanks. During the regular agenda, the board approved a professional services agreement for siphon improvements and adopted a resolution to amend the procurement policy regarding delegation of authority. An executive session was held to discuss legal matters, real property, and personnel matters.
Extracted from official board minutes, strategic plans, and video transcripts.
Track San Jacinto River Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge