Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide Construction Management Services for Wastewater Treatment Facility Expansion - Phase 3A, 3C, and 3D Projects.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes construction of a new wastewater treatment facility. The wastewater treatment facility will be a 15,000 gallon per day mini MBR. The project also includes influent and effluent piping, electrical site work, civil site work, and removal of an existing, abandoned wastewater treatment plant. Approx. 60 LF of 6" PVC sewer line; 279 LF Fencing; 4 Ea Sewer manhole;
Posted Date
Dec 16, 2025
Due Date
Feb 19, 2026
Release: Dec 16, 2025
Close: Feb 19, 2026
Work includes construction of a new wastewater treatment facility. The wastewater treatment facility will be a 15,000 gallon per day mini MBR. The project also includes influent and effluent piping, electrical site work, civil site work, and removal of an existing, abandoned wastewater treatment plant. Approx. 60 LF of 6" PVC sewer line; 279 LF Fencing; 4 Ea Sewer manhole;
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Construction of wastewater treatment plant expansion.
AvailableProvide professional construction management services for the renovation and expansion. The project will include building renovation, selective demolition, structural repairs, building system upgrades, firefighter health and safety improvements, and construction of new or reconfigured operational spaces.
Posted Date
Jan 7, 2026
Due Date
Jan 30, 2026
Release: Jan 7, 2026
Close: Jan 30, 2026
Provide professional construction management services for the renovation and expansion. The project will include building renovation, selective demolition, structural repairs, building system upgrades, firefighter health and safety improvements, and construction of new or reconfigured operational spaces.
AvailableWork consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
Posted Date
Dec 14, 2025
Due Date
Jan 29, 2026
Release: Dec 14, 2025
Close: Jan 29, 2026
Work consist of relocate the phase i package headworks, install two (2) new equalization (EQ) basins with associated pump station, install two (2) new aeration basins including fine bubble diffusers, a selector tank, and a swing zone, install one (1) new 75' diameter secondary clarifier, modify the existing (phase I) RAS pump station, install new (phase II) RAS pump station, install two (2) new disc filters, expand effluent pump station, upgrade the existing aerobic digestion tank with new equipment and decant system, convert existing digester decant wet well pump station to duplex sludge transfer pump station. See attached bid ad.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis