Connecticut State Contracting Standards Board
State AgencyCT
Posted
Aug 27, 2026
Oct 8, 2026
Description: Work includes replacement of bard wallmount W70A2-C00XXXXXJ wall mount HVAC unit with the same or like kind. To include all complete installation, commissioning and disposal of old unit.
County · LA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Lafayette Consolidated Government.
These related opportunities are still open for bidding.
Connecticut State Contracting Standards Board
State AgencyCT
Posted
Aug 27, 2026
Oct 8, 2026
Replacement of an owner-supplied chiller.
Pennsylvania Turnpike Commission
State AgencyPA
Posted
Aug 28, 2026
Sep 11, 2026
Provide 12 EA of coil degreaser, HVAC use, 18 oz can, non-toxic, non- flammable, odorless, biodegradeable, NSF registered, viper expanding foam & 4 EA of air conditioner, 10000 BTU, 115 volt, Nema plug 5-15P, cabinet size 20W X 17-1/2D X 14-1/2H, window unit.
FederalVA
Posted
Aug 28, 2026
Sep 11, 2026
Provide bldg. 202 chiller replacement. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform the repair by replacement of the 50-ton chiller with a 100-ton chiller. See attached file.
Posted
Sep 1, 2026
Sep 11, 2026
Provide 100 ton chiller rental. The chiller and accessory equipment shall be delivered and set up by the contractor. The vendor shall provide training to three government personnel who shall operate the equipment during the rental period and change the chilled water filters as needed. The chiller shall be rated for at least a 100-ton nominal and 100-ton design refrigeration capacity and shall be capable of supplying at least 300 GPM with a pressure loss of 40 psi in the customer loop (i.e. from the chiller CW discharge to the chiller CW inlet). The chiller shall be capable of being operated from no cooling load up to 100-tons continuously where compressors shall automatically come on and off line as required and the automatic recirculation valve shall open to maintain the required minimum flow through the chiller during low flow conditions and close during high chill water demand conditions. The water to be chilled is freshwater. See attached file.