Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace runway NAVAIDS.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project will replace runway and taxiway lighting and replace and relocate REILs and PAPIs. This will include new conduit, base cans, wiring, a new vault enclosure and regulator. Replacing the beacon light is an alternate bid item.
Posted Date
Jun 9, 2025
Due Date
Jul 8, 2026
Release: Jun 9, 2025
Close: Jul 8, 2026
Project will replace runway and taxiway lighting and replace and relocate REILs and PAPIs. This will include new conduit, base cans, wiring, a new vault enclosure and regulator. Replacing the beacon light is an alternate bid item.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide rehabilitate runway 5-23.
Posted Date
Jan 27, 2026
Due Date
Feb 25, 2026
Release: Jan 27, 2026
Close: Feb 25, 2026
Provide rehabilitate runway 5-23.
AvailableSpecific work required includes, but is not limited to: Main runway (36R/18L); Replace existing halogen lighting system with a Youyang LED system; Replace distance remaining signage; Replace PAPI; Utilize existing handholds and conduit; Utilize existing cabling where feasible; Alternate runway (36L/18R); Fix damaged handholds. See outside link.
Posted Date
Jan 22, 2026
Due Date
Mar 6, 2026
Release: Jan 22, 2026
Close: Mar 6, 2026
Specific work required includes, but is not limited to: Main runway (36R/18L); Replace existing halogen lighting system with a Youyang LED system; Replace distance remaining signage; Replace PAPI; Utilize existing handholds and conduit; Utilize existing cabling where feasible; Alternate runway (36L/18R); Fix damaged handholds. See outside link.
AvailableWorks include approx. 8,631 SF Pavement Marking Removal; 12,479 SF Runway and Taxiway Marking: White; 10,739 SF Runway and Taxiway Marking: Black; 1,742 SF Runway and Taxiway Marking: Red; 4,090 LF of Crack Seal.
Posted Date
Jan 23, 2026
Due Date
Mar 5, 2026
Release: Jan 23, 2026
Close: Mar 5, 2026
Works include approx. 8,631 SF Pavement Marking Removal; 12,479 SF Runway and Taxiway Marking: White; 10,739 SF Runway and Taxiway Marking: Black; 1,742 SF Runway and Taxiway Marking: Red; 4,090 LF of Crack Seal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →