Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Fayette County Airport Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Fayette County Airport Authority
Provide rehabilitate runway 5-23.
Posted Date
Jan 27, 2026
Due Date
Feb 25, 2026
Release: Jan 27, 2026
Fayette County Airport Authority
Close: Feb 25, 2026
Provide rehabilitate runway 5-23.
AvailableFayette County Airport Authority
Project includes the installation of an Animal Heavy Use Area (AHUA), including one (1) 46-foot long by 48-foot wide pen, one (1) 36-foot long by 48-foot wide pen, and a 30-foot by 32-foot wide Manure Stacking Structure. Additionally, the project will include a 112-foot long by 50-foot wide roof structure, interior walls, exterior 4-strand fence, gates, animal walkway, reinforced access road, waterline, water troughs, roof water and subsurface drains, storm manhole, and level spreader.
Posted Date
Sep 23, 2025
Due Date
Jan 21, 2026
Release: Sep 23, 2025
Fayette County Airport Authority
Close: Jan 21, 2026
Project includes the installation of an Animal Heavy Use Area (AHUA), including one (1) 46-foot long by 48-foot wide pen, one (1) 36-foot long by 48-foot wide pen, and a 30-foot by 32-foot wide Manure Stacking Structure. Additionally, the project will include a 112-foot long by 50-foot wide roof structure, interior walls, exterior 4-strand fence, gates, animal walkway, reinforced access road, waterline, water troughs, roof water and subsurface drains, storm manhole, and level spreader.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.