Closing soon

Replace Existing Split System HVAC Equipment and Boiler in Barrack G, and Existing Boiler in Garage

Description: Project will consist of some design build for the replacement of the existing 30-ton split system, the pump package, the existing boiler that supplies heating water to hydronic vavs and perimeter baseboard radiant heaters, replacement of pneumatically controlled VAVs (hydronic and cooling only) with new hydronic DDC controlled VAVs, replacement of existing ductless mini-split system, replacement of split system unit, repairing attic insulation, and replacement of oil-fired boiler in the maintenance garage. The project will also include temporary conditioning of the space during the replacement of the main hvac equipment until the system is operationally on-line.

Buyer
Released
Jun 17, 2026
Closes
Aug 26, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts