Higher EducationNY
Posted
Oct 1, 2026
Oct 29, 2026
Replace Athletic Flooring in SERC
The project involves removing existing athletic flooring and carpeting, including adhesives; moving athletic equipment as needed; replacing affected handrails and electrical devices; and installing new flooring according to the specified layout. The solicitation requires sealed bids and sets participation goals of 15% MBE and 15% WBE. A mandatory site visit and walk-through is scheduled for 9:00 a.m. on October 22, 2026, at the SERC Lobby, and bid documents should be requested from Mark Stacy.
