NYC School Construction Authority
State AgencyNY
Aug 8, 2026
Closes
Sep 9, 2026
Interior and Exterior Repairs RFP
Interior and Exterior Repairs.
Description: Repairs to the interior moisture damage to patient rooms and other identified areas within the Carter County Healthcare Facility. The project involves water intrusion and repairs to the interior of the occupied Critical Access Hospital. Construction of/to a health care facility, and OSHA regulations. Identified areas for repair include Lab 1123, Room 1302, Room 1303, Room 1304 and Room 1305. A recent rain resulted in one leak in administration. Also included in this project: installing a ceiling fan in the atrium (second floor) to address heat stratification, an item that was value-engineered out of the original construction plans; adding window film to reduce solar heat gain and increase security in the second-floor PT room; investigating a destratification fan for entry heat stratification; and replacing the exterior kitchen door, which does not align properly in its frame, allowing air infiltration.
County · MT, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Carter County.
Adjacent opportunities open for bidding right now.
NYC School Construction Authority
State AgencyNY
Aug 8, 2026
Closes
Sep 9, 2026
Interior and Exterior Repairs.
Maryland Department of Commerce
State AgencyMD
Aug 31, 2026
Closes
Sep 11, 2026
New exhibits are desired to guide wayfinding, orient visitors to the site and viewshed, interpret geology and natural history, and encourage visitation to area attractions and travel on scenic byways. To design, develop, fabricate and install signs and exhibits at the sideling hill eastbound and westbound rest areas (welcome center) near
Central Lincoln Peoples Utility District
Special DistrictOR
Aug 6, 2026
Closes
Aug 27, 2026
Perform asbestos abatement of identified flooring materials and sinks at the owner's old office building prior to demolition. A new headquarters building will be constructed.
Missouri Office of Administration
State AgencyMO
Aug 15, 2026
Closes
Oct 1, 2026
The project includes limited demolition of MEP systems within existing building. New electrical service by evergy and new distribution gear for 3-phase service with connection to new and existing panels within building. Various rooms are being remodeled in office areas. Upper standing seam roof is to be replaced in its entirety. New HVAC is being replaced for all cooling areas with added code required ventilation systems. Lighting is being replaced for led where fluorescent fixtures exist. Windows all entire first floor area are being replaced with non-operable windows. Three exterior man doors and various overhead doors at storage building. Civil components only electrical service work and pads for electrical gear. Plumbing components include restroom fixture replacement. Finishes for paint/flooring are indicated in contract documents. Mechanical/electrical components include other work indicated in the contract documents.