CountyFL
Posted
Oct 23, 2026
Nov 18, 2026
Circle B Floating Dock RFP
Construction of an ADA-Compliant Floating Dock with Gangway at Circle B Bar Reserve.
Description: Work consists of: Remove and replace 18 damaged large Module Assemblies (MAs); Remove and replace 40 open well style or damaged small MAs and replace with standard small MA; Remove and replace keel deflection system (KDS) on all nine docks; Remove and replace all pontoon straps and hardware (36” lifting eyes) for all nine dock.
Federal · VA, US
Adjacent opportunities open for bidding right now.
CountyFL
Posted
Oct 23, 2026
Nov 18, 2026
Construction of an ADA-Compliant Floating Dock with Gangway at Circle B Bar Reserve.
CityOH
Posted
Oct 29, 2026
Nov 19, 2026
Replacement of the floating dock at the Shelby Street Boat Launch.
Special DistrictWA
Posted
Oct 12, 2026
Nov 9, 2026
Construction services for a Possession Boat Launch Floating Dock Replacement Project. Generally, the Port of South Whidbey Project includes to demolition of structures; reinstallation of existing gangway; fabrication and installation of floats; installation of pile hoops; modify existing concrete abutment and install concrete Sonotubes.
StateNL
Posted
Oct 23, 2026
Feb 26, 2027
OilCo, on behalf of Bull Arm Fabrication Inc., seeks proposals for a Pre-Front End Engineering and Design study for a floating dry dock at the Bull Arm Fabrication Site in Trinity Bay, Newfoundland and Labrador. The study will evaluate specifications, design concepts, costs, construction strategies, site requirements, project timelines and key risks. It will also identify infrastructure, equipment and workforce requirements to support construction and long-term operations.
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.