FederalCA
Posted
Aug 13, 2026
Sep 8, 2026
Repair of Sidewalks on Coast Guard Island RFP
The contractor shall provide all labor, materials, and equipment to safely demolish, remove, and replace the identified deteriorated concrete sections.
Description: Repair and refinish the exterior entrance stairs at building 3. The work includes the demolition and removal of existing failing stairs, surface preparation of the underlying concrete, application of a slip-resistant polymer-modified concrete overlay, and the installation of a new Type 316 stainless steel center handrail at the main entrance.
Federal · CA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalCA
Posted
Aug 13, 2026
Sep 8, 2026
The contractor shall provide all labor, materials, and equipment to safely demolish, remove, and replace the identified deteriorated concrete sections.
FederalDC
Posted
Aug 20, 2026
Sep 9, 2026
The U.S. Department of State, through the U.S. Embassy Oslo, is soliciting quotations for CMR Exterior Stairs Repair at Villa Otium, Nobels Gate 28, Oslo, Norway. The procurement is an active solicitation for a firm-fixed-price purchase order using a lowest-price technically acceptable evaluation, with quotations submitted electronically in English to OsloGSOBids@state.gov. A site visit and Teams conference are scheduled for August 27, 2026, questions are due August 31, and quotations are due September 9, 2026, at 2:00 p.m. CEST.
FederalDC
Posted
Sep 2, 2026
Sep 8, 2026
The United States Coast Guard Aviation Logistics Center is soliciting quotations to repair three G.C.U. units for Coast Guard HC-144 aircraft. The notice is an RFQ for commercial items under NAICS 488190, and quotations are due September 8, 2026, at 4:00 p.m. Eastern Time. Email quotations are preferred and should reference solicitation 70Z03826QL0000202 and be sent to debra.w.heath@uscg.mil.
CountyVA
Posted
Aug 27, 2026
Oct 8, 2026
Restoration and improvements to the Reclaimed Water Distribution Facility computer lab and storage building (2 separate buildings). Work includes new charcoal asphalt shingle roofing (25 years minimum), new vinyl siding, new PVC fascia and soffit, and new aluminum gutters with leaf guards. Stated scope must be completed within 90 days from the date of execution.