CountyWA
Posted
-
Jan 11, 2027
Lower Chiwawa River Project Area D RFP
Chelan County seeks sealed bids for river restoration between river-miles 5 and 6 on the Chiwawa River. Work includes temporary access and staging areas, traffic control, floodplain and channel excavation, material disposal, erosion control, large-wood installation, sensitive-area protection, and construction surveying. Onsite work must occur between June 7 and August 20, 2027, with work below the ordinary high-water mark limited to July 1–31, 2027.
